mirror of
https://github.com/azaion/admin.git
synced 2026-04-22 09:06:33 +00:00
Sync .cursor from suite (autodev orchestrator + monorepo skills)
This commit is contained in:
@@ -0,0 +1,53 @@
|
||||
# Step 6: Deployment Procedures
|
||||
|
||||
**Role**: DevOps / Platform engineer
|
||||
**Goal**: Define deployment strategy, rollback procedures, health checks, and deployment checklist.
|
||||
**Constraints**: Procedures document — no implementation.
|
||||
|
||||
## Steps
|
||||
|
||||
1. Define deployment strategy:
|
||||
- Preferred pattern: blue-green / rolling / canary (choose based on architecture)
|
||||
- Zero-downtime requirement for production
|
||||
- Graceful shutdown: 30-second grace period for in-flight requests
|
||||
- Database migration ordering: migrate before deploy, backward-compatible only
|
||||
|
||||
2. Define health checks:
|
||||
|
||||
| Check | Type | Endpoint | Interval | Threshold |
|
||||
|-------|------|----------|----------|-----------|
|
||||
| Liveness | HTTP GET | `/health/live` | 10s | 3 failures → restart |
|
||||
| Readiness | HTTP GET | `/health/ready` | 5s | 3 failures → remove from LB |
|
||||
| Startup | HTTP GET | `/health/ready` | 5s | 30 attempts max |
|
||||
|
||||
3. Define rollback procedures:
|
||||
- Trigger criteria: health check failures, error rate spike, critical alert
|
||||
- Rollback steps: redeploy previous image tag, verify health, rollback database if needed
|
||||
- Communication: notify stakeholders during rollback
|
||||
- Post-mortem: required after every production rollback
|
||||
|
||||
4. Define deployment checklist:
|
||||
- [ ] All tests pass in CI
|
||||
- [ ] Security scan clean (zero critical/high CVEs)
|
||||
- [ ] Database migrations reviewed and tested
|
||||
- [ ] Environment variables configured
|
||||
- [ ] Health check endpoints responding
|
||||
- [ ] Monitoring alerts configured
|
||||
- [ ] Rollback plan documented and tested
|
||||
- [ ] Stakeholders notified
|
||||
|
||||
## Self-verification
|
||||
|
||||
- [ ] Deployment strategy chosen and justified
|
||||
- [ ] Zero-downtime approach specified
|
||||
- [ ] Health checks defined (liveness, readiness, startup)
|
||||
- [ ] Rollback trigger criteria and steps documented
|
||||
- [ ] Deployment checklist complete
|
||||
|
||||
## Save action
|
||||
|
||||
Write `deployment_procedures.md` using `templates/deployment_procedures.md`.
|
||||
|
||||
## Blocking
|
||||
|
||||
**BLOCKING**: Present deployment procedures to user. Do NOT proceed until confirmed.
|
||||
Reference in New Issue
Block a user