mirror of
https://github.com/azaion/detections.git
synced 2026-04-22 08:26:31 +00:00
2.2 KiB
2.2 KiB
Autopilot State
Current Step
flow: existing-code step: 5 name: Run Tests status: in_progress sub_step: 2 — Run Tests retry_count: 0
Completed Steps
| Step | Name | Completed | Key Outcome |
|---|---|---|---|
| 1 | Document | 2026-03-21 | 10 modules, 4 components, full _docs/ generated from existing codebase |
| 2 | Test Spec | 2026-03-21 | 39 test scenarios (16 positive, 8 negative, 11 non-functional), 85% total coverage, 5 artifacts produced |
| 3 | Decompose Tests | 2026-03-23 | 11 tasks (AZ-138..AZ-148), 35 complexity points, 3 batches. Phase 3 test data gate PASSED: 39/39 scenarios validated, 12 data files provided. |
| 4 | Implement Tests | 2026-03-23 | 11 tasks implemented across 4 batches, 38 tests (2 skipped), all code reviews PASS_WITH_WARNINGS. Commits: 5418bd7, a469579, 861d4f0, f0e3737. |
Key Decisions
- User chose to document existing codebase before proceeding
- Component breakdown: 4 components (Domain, Inference Engines, Inference Pipeline, API)
- Verification: 4 legacy issues found and documented (unused serialize/from_msgpack, orphaned queue declarations)
- Input data coverage approved at ~90% (Phase 1a)
- Test coverage approved at 85% (21/22 AC, 13/18 restrictions) with all gaps justified
- User chose refactor path (decompose tests → implement tests → refactor)
- Integration Tests Epic: AZ-137
- Test Infrastructure: AZ-138 (5 pts)
- 10 integration test tasks decomposed: AZ-139 through AZ-148 (30 pts)
- Total: 11 tasks, 35 complexity points, 3 batches
- Phase 3 (Test Data Validation Gate) PASSED: 39/39 scenarios have data, 85% coverage, 0 tests removed
- Test data: 6 images, 3 videos, 1 ONNX model, 1 classes.json provided by user
- User confirmed dependency table and test data gate
- Jira MCP auth skipped — tickets not transitioned to In Testing
Last Session
date: 2026-03-24 ended_at: Step 4 Implement Tests — COMPLETE. All 11 tasks, 38 tests, 4 batches. reason: step completed, context limit approaching notes: All integration tests implemented and committed. Next step: 5 Run Tests — verify tests pass before proceeding to refactor. Recommend fresh conversation for better context management.
Blockers
- none