Update README and implementer documentation to reflect changes in task orchestration and structure. Remove obsolete commands and templates related to initial implementation and code review. Enhance task decomposition workflow and clarify input specifications for improved task management.
This commit is contained in:
@@ -332,13 +332,15 @@ Fix any issues found before proceeding to risk identification.
|
||||
|
||||
**Constraints**: Be concise — fewer words with the same meaning is better
|
||||
|
||||
1. Generate Jira Epics from components using Jira MCP, structured per `templates/epic-spec.md`
|
||||
2. Order epics by dependency (which must be done first)
|
||||
3. Include effort estimation per epic (T-shirt size or story points range)
|
||||
4. Ensure each epic has clear acceptance criteria cross-referenced with component specs
|
||||
5. Generate updated draw.io diagram showing component-to-epic mapping
|
||||
1. **Create "Bootstrap & Initial Structure" epic first** — this epic will parent the `01_initial_structure` task created by the decompose skill. It covers project scaffolding: folder structure, shared models, interfaces, stubs, CI/CD config, DB migrations setup, test structure.
|
||||
2. Generate Jira Epics for each component using Jira MCP, structured per `templates/epic-spec.md`
|
||||
3. Order epics by dependency (Bootstrap epic is always first, then components based on their dependency graph)
|
||||
4. Include effort estimation per epic (T-shirt size or story points range)
|
||||
5. Ensure each epic has clear acceptance criteria cross-referenced with component specs
|
||||
6. Generate updated draw.io diagram showing component-to-epic mapping
|
||||
|
||||
**Self-verification**:
|
||||
- [ ] "Bootstrap & Initial Structure" epic exists and is first in order
|
||||
- [ ] Every component maps to exactly one epic
|
||||
- [ ] Dependency order is respected (no epic depends on a later one)
|
||||
- [ ] Acceptance criteria are measurable
|
||||
@@ -384,6 +386,7 @@ Before writing the final report, verify ALL of the following:
|
||||
- [ ] Test data management is defined
|
||||
|
||||
### Epics
|
||||
- [ ] "Bootstrap & Initial Structure" epic exists
|
||||
- [ ] Every component maps to an epic
|
||||
- [ ] Dependency order is correct
|
||||
- [ ] Acceptance criteria are measurable
|
||||
|
||||