# Autodev State ## Current Step flow: existing-code step: 10 name: Implement status: in_progress sub_step: phase: 6 name: implement-tasks detail: "batch 8 = tracker-only fix for AZ-842 drift (work already shipped 2026-05-29 in commit 42b1db6; Jira ticket was stuck in To Do; transitioned To Do → In Progress → Done with read-back verified). Corrected cycle-4 todo/ remainder: AZ-899 (1) + AZ-900 (1) + AZ-901 (1) = 3 SP product (down from 6 — AZ-842 erroneously listed by my earlier eighth-bump preamble narrative). OKVIS2 chain (AZ-943 + AZ-951 + AZ-952) sits in todo/ but is sequenced after the Derkachi e2e flight test passes per user 2026-05-29 directive." retry_count: 0 cycle: 4 tracker: jira