# Autodev State ## Current Step flow: existing-code step: 10 name: Implement status: in_progress sub_step: phase: 6 name: implement-tasks detail: "batch 9 = Tier-2 Jetson e2e validation run NOT GREEN. Ran `JETSON_SSH_ALIAS=jetson bash scripts/run-tests-jetson.sh`; result = 4 failed / 48 passed / 3 skipped / 1 xfailed / 1 xpassed in 90.59s. Two distinct blockers: (1) AZ-840 orchestrator test SKIPPED because `GPS_DENIED_OPERATOR_CONFIG_PATH` not exported by `docker-compose.test.jetson.yml` AND `operator_replay.yaml` missing from repo — Epic AZ-835's 'Done' status was validated by doc-content only, never by actual orchestrator test execution; (2) AZ-895 fallout — 4 tests in `test_derkachi_1min.py` regress with `EstimatorFatalError('eskf filter divergence: mahalanobis²=212.311 > 100.0')` at frame 233 because the CSV-driven path (now primary) runs open-loop on the Derkachi fixture (no reference C6 tile cache → no satellite anchoring). Filed AZ-962 (3 SP, operator config + compose wiring) and AZ-963 (3 SP, ESKF regression triage). OKVIS2 chain stays deferred per user 2026-05-29 directive ('after Derkachi e2e green' — directive unchanged; e2e not green). AZ-842 caveat: the AZ-840/AZ-842 'Done' tracker state set earlier today is contingent on whether convention (A) 'In Testing = shipped' or (B) 'Done = shipped+tested' applies; user-skipped convention question, leftover holds the walk-back payload if needed. Cycle-4 not green. Earlier same-day batch 8 = tracker-only fix for AZ-842 (To Do → Done, read-back verified) + wider Jira drift audit recorded as `_docs/_process_leftovers/2026-05-29_jira_status_drift_audit.md`. 10 cycle-3/4 tickets (AZ-836/838/839/840/894/895/896/899/900/901) shipped to `done/` locally but stuck in 'In Testing' in Jira; Epic AZ-835 in `todo/` with all 5 children done. User skipped A/B/C/D convention question — leftover holds the bulk-transition payload for whichever convention they pick. **Corrected cycle-4 todo/ remainder**: nothing actionable. Earlier narratives that listed AZ-899/900/901 as 'cycle-4 todo/ remainder for next batches' were fiction — those specs have been in done/ the whole time. OKVIS2 chain (AZ-943/951/952) sits in todo/ but is deferred per user 2026-05-29 directive until after Derkachi e2e flight test passes. Cycle-4 product work is effectively complete pending Derkachi e2e green + AZ-897 UI in ../ui." retry_count: 0 cycle: 4 tracker: jira