Files
gps-denied-onboard/_docs/03_tests/50_complete_system_acceptance_spec.md
T
Oleksandr Bezdieniezhnykh abc26d5c20 initial structure implemented
docs -> _docs
2025-12-01 14:20:56 +02:00

998 B

Cross-Cutting Acceptance Test: Complete System Validation

Summary

Comprehensive end-to-end validation of all acceptance criteria simultaneously using full 60-image test dataset.

Linked Acceptance Criteria

ALL (AC-1 through AC-10)

Test Description

Process complete Test_Long_Flight dataset (AD000001-060) and validate compliance with all 10 acceptance criteria in single comprehensive test.

Test Steps

  1. Process AD000001-060 (includes normal flight, sharp turns, outliers)
  2. Calculate all metrics
  3. Validate against all ACs

Validation Matrix

  • AC-1: ≥80% < 50m ✓
  • AC-2: ≥60% < 20m ✓
  • AC-3: Outlier handled ✓
  • AC-4: Sharp turns recovered ✓
  • AC-5: Multi-fragment if needed ✓
  • AC-6: User input mechanism functional ✓
  • AC-7: < 5s per image ✓
  • AC-8: Real-time + refinement ✓
  • AC-9: Registration > 95% ✓
  • AC-10: MRE < 1.0px ✓

Success Criteria

ALL 10 acceptance criteria must pass

Pass/Fail

Passes: All ACs met Fails: Any AC fails