Files
gps-denied-onboard/_docs/_autodev_state.md
T

1.0 KiB

Autodev State

Current Step

flow: greenfield step: 3 name: Plan status: in_progress sub_step: phase: 5 name: plan-step-1-complete detail: "Plan Step 1 (test-spec sub-skill) COMPLETE. Phase 1 (input-data analysis) DONE earlier; Phase 2 (test scenarios, 8 artifacts) DONE; Phase 3 HARD GATE PASSED (100% spec-level coverage, 0 truly-missing items, 0 removed tests, defer-don't-remove per Phase 1 D4); Hardware Assessment DONE — ## Test Execution section appended to environment.md classifying project as hardware-dependent and recording the Mode-C (both: Docker for T1/T2/T3 + bench-local for T4 + field for T5) per-tier split decision; Phase 4 (runner-scripts) SKIPPED per skill rule (planning context — script creation deferred to Decompose as tasks). Plan Step 1 user-level BLOCKING gate (test coverage confirmation) was satisfied by the Phase 2 → Phase 3 confirmation earlier in this session. Next: Plan Step 2 (Solution Analysis), opening with BLOCKING Phase 2a.0 (Glossary + Architecture Vision)." retry_count: 0 cycle: 1 tracker: jira