# Autodev State ## Current Step flow: existing-code step: 5 name: Decompose Tests status: not_started sub_step: phase: 0 name: awaiting-invocation detail: "" retry_count: 0 cycle: 1 tracker: jira ## Rename tracking (Jira AZ-EPIC + child stories B1-B12) See `_docs/_process_leftovers/2026-05-14_rename-flights-to-missions.md`. Local code work for B5, B6, B7, B8, B9, B12 landed 2026-05-15; .woodpecker tag rename done. Cross-repo work pending: B4 (suite), B10-suite, B11 (autopilot + ui), B12 spec catch-up in suite. Leftover stays until those land.