@@ -0,0 +1,57 @@
## Quality Checklist (before FINAL_report.md)
Before writing the final report, verify ALL of the following:
### Blackbox Tests
- [ ] Every acceptance criterion is covered in traceability-matrix.md
- [ ] Every restriction is verified by at least one test
- [ ] Positive and negative scenarios are balanced
- [ ] Docker environment is self-contained
- [ ] Consumer app treats main system as black box
- [ ] CI/CD integration and reporting defined
### Architecture
- [ ] Covers all capabilities from solution.md
- [ ] Technology choices are justified
- [ ] Deployment model is defined
- [ ] Blackbox test findings are reflected in architecture decisions
### Data Model
- [ ] Every entity from architecture.md is defined
- [ ] Relationships have explicit cardinality
- [ ] Migration strategy with reversibility requirement
- [ ] Seed data requirements defined
- [ ] Backward compatibility approach documented
### Deployment
- [ ] Containerization plan covers all components
- [ ] CI/CD pipeline includes lint, test, security, build, deploy stages
- [ ] Environment strategy covers dev, staging, production
- [ ] Observability covers logging, metrics, tracing, alerting
- [ ] Deployment procedures include rollback and health checks
### Components
- [ ] Every component follows SRP
- [ ] No circular dependencies
- [ ] All inter-component interfaces are defined and consistent
- [ ] No orphan components (unused by any flow)
- [ ] Every blackbox test scenario can be traced through component interactions
### Risks
- [ ] All High/Critical risks have mitigations
- [ ] Mitigations are reflected in component/architecture docs
- [ ] User has confirmed risk assessment is sufficient
### Tests
- [ ] Every acceptance criterion is covered by at least one test
- [ ] All 4 test types are represented per component (where applicable)
- [ ] Test data management is defined
### Epics
- [ ] "Bootstrap & Initial Structure" epic exists
- [ ] "Blackbox Tests" epic exists
- [ ] Every component maps to an epic
- [ ] Dependency order is correct
- [ ] Acceptance criteria are measurable
**Save action**: Write `FINAL_report.md` using `templates/final-report.md` as structure