[AZ-491] [AZ-492] [AZ-493] [AZ-494] [AZ-495] [AZ-496] Cycle 3 Step 15 skip + Step 16 deploy report
Step 15 (Performance Test): SKIPPED. User skipped the optional gate
question. Per meta-rule.mdc, performance tests require explicit
approval; a skipped question is not approval. Recorded as leftover at
_docs/_process_leftovers/2026-05-12_perf-cycle3-harness-execution.md
for replay at next /autodev invocation.
Step 16 (Deploy): COMPLETED. Produced deploy_cycle3.md mirroring the
cycle-2 shape. Covers:
- 9 cycle-3 commits + zero DB migration
- Config changes (JWT_ISSUER/JWT_AUDIENCE env vars w/ fail-fast,
8.0.25 package bumps, new TestSupport project)
- Pre-deploy gate recap (Steps 11-15)
- Cycle-3 operational risks R1-R4 (admin-team iss/aud confirm,
cross-repo doc deferral, cycle-2 R1/R3 carry-overs, test-runner
log line)
- Rollback plan, post-deploy verification (incl. wrong-iss / wrong-
aud smoke probes), CI/CD push policy
- Resolved this cycle: F-AUTH-2, D1, D3, PT-07/PT-08 leftover
- Follow-up backlog: D4 NU1902 bump, F-DBR-2 third guard, F-PERF-1
token-history hardening, image-fixture consolidation, AC-7 cross-
repo write, no-revocation-list residual
Next: Step 17 (Retrospective, cycle-end mode).
Co-authored-by: Cursor <cursoragent@cursor.com>
This commit is contained in:
@@ -2,13 +2,13 @@
|
||||
|
||||
## Current Step
|
||||
flow: existing-code
|
||||
step: 14
|
||||
name: Security Audit
|
||||
step: 16
|
||||
name: Deploy
|
||||
status: completed
|
||||
sub_step:
|
||||
phase: 5
|
||||
name: PASS_WITH_WARNINGS
|
||||
detail: "Step 14 PASS_WITH_WARNINGS — all 5 phases (Dependency Scan, Static Analysis, OWASP Top 10, Infrastructure, Security Report) refreshed for cycle 3. Resolved: F-AUTH-2 (Medium, AZ-494), D1 (Medium, AZ-496), D3 (Low, AZ-496). New cycle-3 findings: D4 (Low, test-only NU1902), F-AUTH-3 (Info, test-runner), F-AUTH-4 (Info, by design), F-DBR-1 (false positive), F-DBR-2 (Low, test-only TRUNCATE guard), F-PERF-1 (Low, operator-CLI). 0 Critical, 0 High, 0 new Medium. Next: Step 15 (Performance Test, optional gate)."
|
||||
phase: 7
|
||||
name: deploy-report-written
|
||||
detail: "Step 16 COMPLETED — deploy report written to _docs/03_implementation/deploy_cycle3.md (mirrors cycle-2 shape; project does not use _docs/04_deploy/ layout). 9 commits pushed to origin/dev. No DB migration. 4 cycle-3-specific operational risks recorded (R1 JWT_ISSUER/JWT_AUDIENCE prod values, R2 cross-repo doc deferral, R3 cycle-2 carry-overs still apply, R4 test-runner log line). Rollback plan + post-deploy verification steps captured. Push policy honoured (dev only). Next: Step 17 (Retrospective)."
|
||||
retry_count: 0
|
||||
cycle: 3
|
||||
tracker: jira
|
||||
|
||||
Reference in New Issue