Commit Graph

2 Commits

Author SHA1 Message Date
Oleksandr Bezdieniezhnykh 534ab41b8e [AZ-372] Apply dotnet format whitespace cleanup; archive batch 22
ci/woodpecker/push/01-test Pipeline was successful
ci/woodpecker/push/02-build-push Pipeline was successful
Pure whitespace-only cleanup uncovered by the new format gate from the
previous commit. Verified via `git diff -w --stat`: only 4 files differ
when whitespace is ignored, and those differ only by the BOM byte.

Cleanup kinds applied across 22 source files:
- BOM removal (MapConfig.cs, SatTile.cs, GeoUtils.cs,
  IntegrationTests/Program.cs)
- CRLF -> LF (IntegrationTests/Program.cs)
- Trailing whitespace on blank lines (Common, Api, DataAccess,
  IntegrationTests, Services.RegionProcessing,
  Services.TileDownloader)
- Final newline added (RoutePoint.cs, GeoPoint.cs, others)

After this commit `dotnet format whitespace SatelliteProvider.sln
--verify-no-changes` exits 0; AC-1 is enforceable from `scripts/
run-tests.sh` going forward.

Also lands the batch 22 report, code-review report
(PASS_WITH_WARNINGS, 2 Low findings — both deferred per spec),
dependency-table status update (AZ-372 -> Done (In Testing)), task
archive (todo/ -> done/), and autodev state update.

Co-authored-by: Cursor <cursoragent@cursor.com>
2026-05-11 04:43:08 +03:00
Oleksandr Bezdieniezhnykh 8b0ddae075 [AZ-312] [AZ-313] [AZ-314] Split Services into per-component csprojs
Phase B of architecture coupling refactor (epic AZ-309). Replaces
the monolithic SatelliteProvider.Services with three per-component
csprojs to add a compiler-enforced module boundary (resolves F4):

- SatelliteProvider.Services.TileDownloader
- SatelliteProvider.Services.RegionProcessing
- SatelliteProvider.Services.RouteManagement

DI registrations relocated into per-component AddTileDownloader /
AddRegionProcessing / AddRouteManagement extension methods called
from Program.cs. RateLimitException moved to Common/Exceptions/ to
keep the three new csprojs as siblings (no Region->TileDownloader
ProjectReference). Dockerfiles and consumer csprojs (Api, Tests)
rewired to the new project paths. No DI lifetime or hosted-service
order changes.

Build: 0 warn, 0 err. Unit tests: 40/40. Smoke integration: green.
Co-authored-by: Cursor <cursoragent@cursor.com>
2026-05-10 07:15:44 +03:00