Drains all three deferred perf-harness items in one batch:
- PT-01..PT-06 now carry Authorization: Bearer minted via the canonical
SatelliteProvider.TestSupport.JwtTokenFactory (AZ-491) — no third copy
of JWT logic in the shell.
- PT-07 implemented as cold + warm dual-pass distribution (N=20 each),
reports p50/p95 for both passes and fails if warm p95 >= cold p95.
- PT-08 implemented as 20-batch upload distribution with batch p95 gated
at the AZ-488 2000 ms target; per-item gate cost reported as derived
proxy (batch_p95 / batch_size).
New SatelliteProvider.IntegrationTests/PerfBootstrap.cs adds two CLI
short-circuit subcommands (--mint-only and --gen-uav-fixture <path>)
invoked by the shell so the perf script never inlines the JWT or
JPEG-fixture logic. The dispatch sits at the top of Program.cs Main
and runs before any HTTP / DB / readiness setup.
performance-tests.md PT-07 + PT-08 flip from Deferred to Implemented.
traceability-matrix.md PT-07 + PT-08 rows move from recorded to covered
(PT-08 partial due to per-item proxy — flagged Low in batch-4 review).
_docs/_process_leftovers/2026-05-11_perf-pt07-harness.md deleted; the
leftovers directory is now empty.
Closes cycle-2 retro Action 2; LESSONS.md [process] rule about Deferred
NFRs remains in force as a guardrail.
Also includes the previously-uncommitted cumulative review report for
cycle-3 batches 01-03 (generated at the end of batch 3 but not staged).
Co-authored-by: Cursor <cursoragent@cursor.com>
Step 15 (Performance Test) — skipped per gate (option B). Recording two
deferred items in the existing perf leftover:
* PT-07 + PT-08 remain Deferred. Both NFRs depend on the same
baseline-capture harness that has not landed; the integration-test
fixtures needed for PT-08 already exist (UavUploadTests +
UavTileImageFactory), so PT-08 attaches to the same harness as PT-07
when implemented.
* scripts/run-performance-tests.sh PT-01..PT-06 currently return 401
against the post-AZ-487 build because they attach no Bearer token.
Script must mint an HS256 token from JWT_SECRET at script start
before any curl call. Tracked in the leftover so PT-01..PT-06 are
runnable again the same cycle PT-07/PT-08 are activated.
No code change in this commit — leftover + state advance only.
Co-authored-by: Cursor <cursoragent@cursor.com>
Replaces the 501 stub at POST /api/satellite/upload with a multipart
batch endpoint that ingests UAV-captured tiles, runs each item through
a 5-rule quality gate, and persists accepted tiles via the AZ-484
multi-source storage path with source='uav'.
Quality gate (in fixed order, first failure wins): JPEG format
(content-type + magic), size band 5 KiB-5 MiB, exact 256x256
dimensions, captured-at age (no future >30 s skew, no older than
7 days), luminance variance on 32x32 downsample. Closed reject-reason
enumeration in v1.0.0 contract.
Authorization: custom PermissionsRequirement / PermissionsAuthorization
Handler that reads the JWT `permissions` claim (tolerates both
repeated-string and JSON-array shapes). Endpoint protected by
RequiresGpsPermission policy; 401 without token, 403 without GPS perm.
Persistence: file-first to ./tiles/uav/{z}/{x}/{y}.jpg, then
ITileRepository.InsertAsync UPSERT (per-source UPSERT contract from
AZ-484). Per-item failures reported in response without aborting the
batch. Kestrel MaxRequestBodySize and FormOptions limits set to
MaxBatchSize x MaxBytes (default 100 x 5 MiB = 500 MiB).
New frozen contract: _docs/02_document/contracts/api/uav-tile-upload.md
v1.0.0. PT-08 NFR added to performance-tests.md as Deferred (harness
work tracked in PT-07 leftover, per AZ-488 § Risk 4).
Tests: 11 quality-gate unit tests, 5 handler unit tests, 3 file-path
unit tests, 12 permission-handler unit tests, 7 integration tests
(AC-1..AC-6, AC-8). All 253 unit tests + smoke integration suite
green.
Co-authored-by: Cursor <cursoragent@cursor.com>