Phase 6 (Verification): smoke run green (format gate + 200/200
unit + integration smoke). verification_report.md captures
metric deltas vs Phase 0 baseline; all 5 ACs met, all 4
constraints honored, 0 regressions.
Phase 7 (Documentation):
- module-layout.md: corrected DataAccess->Common dependency
(was mistakenly documented as "Imports from: (none)" by
prior AZ-315 baseline; csproj reference + 7 import sites
have actually been there since AZ-309).
- architecture_compliance_baseline.md: F5 entry revised to
reflect the actual layering invariant (one-way: Common
MUST NOT import from DataAccess, but DataAccess MAY
import from Common).
- 00_discovery.md: added "Updates Since Baseline" section
enumerating the AZ-309 split + AZ-350 27-change run +
AZ-372 tooling additions; original tree kept as a
2026-05-10 snapshot.
FINAL_report: complete run summary (10 batches, 27 tasks,
3 K=3 cumulative reviews, baseline->final metric table,
remaining items, lessons learned).
Autodev state: advance Step 8 -> Step 9 (New Task);
sub_step reset to phase 0 awaiting-invocation.