# Retrospective — Cycle 12 (2026-06-26) **Tasks**: AZ-1124 (PT-10 gRPC stream perf, 3 SP). **1 task, 3 SP, 1 batch.** **Mode**: cycle-end. Steps 14 (Security) and 16/16.5 (Deploy/Release) **skipped**. **Previous retro**: `retro_2026-06-25_cycle11.md` ## Implementation Summary | Metric | Cycle 12 | Δ vs cycle 11 | |--------|----------|---------------| | Tasks implemented | **1** | unchanged | | Total complexity delivered | **3 SP** | +2 SP | | Blocked tasks | **0** | unchanged | ## Quality | Gate | Result | |------|--------| | Code review | PASS (batch_01_cycle12) | | Step 11 full suite | **PASS** (exit 0, ~21 min) | | Step 15 perf (PT-01..PT-10) | **PASS** after `GrpcTestHelpers` PEM fix | | Security | Skipped (harness-only; no prod surface) | ## Cycle 12 delta - **PT-10 landed** — first gRPC perf scenario; closes cycle 9–11 retro Action #2. - **Step 15 caught TLS bug** — `CreateFromPemFile(api.crt)` fails on cert-only PEM for host-side gRPC; fixed to `CreateFromPem(text)`. ## Top 3 Improvement Actions (cycle 13 candidates) 1. **F-AZ810-2** `DateTime` → `DateTimeOffset` on `capturedAt` (~1 SP) — carry-over 2. **Align `environment.md` integration command** with `run-tests.sh` (`docker-compose.tests.yml` only) (~0.5 SP) — carry-over 3. **Promote PT-09** inventory inline test into shell harness if production SLO tightens (~2 SP) — optional ## Cycle 12 Verdict **Successful perf-harness cycle** — AZ-1124 delivered PT-10 end-to-end; gRPC stream NFR no longer Unverified. Minor TLS loading fix required at Step 15 gate.