mirror of
https://github.com/azaion/satellite-provider.git
synced 2026-06-21 16:31:15 +00:00
6b373082c8
Phase C of architecture coupling refactor (epic AZ-309). Closes the
last baseline finding (F5 — DataAccess incorrectly documented as
importing Common) and synchronizes the rest of _docs/02_document/
with the post-split project layout from AZ-312/313/314:
- module-layout.md: per-component sections for the three new csprojs
with explicit ProjectReferences and the no-cross-sibling-reference
invariant the split enforces.
- architecture.md: components and internal-communication tables
updated to show calls flow through Common interfaces.
- architecture_compliance_baseline.md: F1..F5 marked Resolved with
task IDs and commit refs; baseline summary now 0 findings.
- diagrams/components.md, components/03_tile_downloader/description.md,
modules/{common_interfaces,services_tile_service,
services_google_maps_downloader,tests_unit}.md updated for the
split, RateLimitException relocation, and new ITileService methods.
Documentation-only batch — no code, no tests, no build changes.
Epic AZ-309 complete (6 tasks across 3 batches).
Co-authored-by: Cursor <cursoragent@cursor.com>
2.0 KiB
2.0 KiB
Task Dependencies
Dependency Graph
Step 6 — Implement Tests (AZ-285..AZ-290)
| Task | Depends On | Points | Status |
|---|---|---|---|
| AZ-285 Test Infrastructure | — | 3 | Done |
| AZ-286 TileService Tests | AZ-285 | 3 | Done |
| AZ-287 RegionService Tests | AZ-285 | 3 | Done |
| AZ-288 RouteService Tests | AZ-285 | 3 | Done |
| AZ-289 Integration Route Maps | AZ-285 | 2 | Done |
| AZ-290 Non-Functional Tests | AZ-285 | 3 | Done |
Step 8 — Refactor 02-coupling-refactoring (AZ-309 epic)
| Task | Depends On | Points | Status |
|---|---|---|---|
| AZ-310 ServeTile via ITileService | — | 3 | Done (In Testing) |
| AZ-311 GetTileByLatLon via ITileService | AZ-310 | 2 | Done (In Testing) |
| AZ-312 Split Services into 3 csprojs | AZ-311 | 5 | Done (In Testing) |
| AZ-313 Update consumers (Api/Tests) | AZ-312 | 3 | Done (In Testing) |
| AZ-314 DI registration split | AZ-313 | 2 | Done (In Testing) |
| AZ-315 Documentation sync | AZ-314 | 2 | In Progress |
Execution Order
Step 6
- AZ-285 (test infrastructure — all others depend on this)
- AZ-286, AZ-287, AZ-288 (unit tests — can run in parallel)
- AZ-289 (integration tests — depends on infra only)
- AZ-290 (non-functional tests — depends on infra only)
Step 8 (refactor)
- AZ-310 → AZ-311 (Phase A: route tile endpoints through ITileService)
- AZ-312 → AZ-313 → AZ-314 (Phase B: physical split + consumer + DI rewire)
- AZ-315 (Phase C: docs sync, must be last)
Total Effort
Step 6: 6 tasks, 17 story points Step 8 (refactor): 6 tasks, 17 story points
Coverage Verification
| Test Spec Category | Covered By |
|---|---|
| blackbox-tests.md (BT-01..BT-12, BT-N01..BT-N05) | AZ-286, AZ-287, AZ-288, AZ-289 |
| performance-tests.md (PT-01..PT-06) | AZ-290 |
| resilience-tests.md (RS-01..RS-06) | AZ-290 |
| security-tests.md (SEC-01..SEC-04) | AZ-290 |
| resource-limit-tests.md (RL-01..RL-04) | AZ-290 |
| traceability-matrix.md (100% AC coverage) | All tasks combined |