Co-authored-by: Cursor <cursoragent@cursor.com>
3.4 KiB
Retrospective — Cycle 10 (2026-06-25)
Tasks: AZ-1113 (REST 400 error sanitizer, 2 SP). 1 task, 2 SP, 1 batch.
Mode: cycle-end (autodev Step 17). Step 16.5 (Release) skipped — no scripts/deploy.sh / _docs/04_release/ harness (same pattern as cycles 1–9).
Previous retro: retro_2026-06-25_cycle9.md
Implementation Summary
| Metric | Cycle 10 | Δ vs cycle 9 |
|---|---|---|
| Tasks implemented | 1 | -1 |
| Batches executed | 1 | unchanged |
| Total complexity delivered | 2 SP | -6 SP |
| Avg tasks / batch | 1 | -1 |
| Blocked tasks | 0 | unchanged |
| Implementation report | YES (implementation_report_rest_error_sanitizer_cycle10.md) |
maintained |
Quality Metrics
Code Review
| Verdict | Count |
|---|---|
| PASS | 1 (batch 01) |
| FAIL | 0 |
No review findings — single-task security hardening with focused tests.
Security Audit (Step 14)
| Finding | Status |
|---|---|
| F-AZ795-1, F-AZ795-2, F-AZ810-1 | Resolved (AZ-1113) |
| F-AZ810-2, D-AZ795-1, D2-cy4 | Open (cumulative PASS_WITH_WARNINGS) |
Cycle 9 retro Action #3 shipped this cycle — first direct cross-cycle security debt closure.
Test & Perf Gates
| Gate | Result |
|---|---|
| Step 11 functional | PASS — 450/450 unit + integration |
| Step 15 perf | PASS — 8/8 after PT-07 harness fix (runs 1–2 failed on marginal p95 noise) |
Efficiency
| Blocker | Resolution |
|---|---|
| Host port 5433 (perf) | docker-compose.perf.yml with ports: !reset [] |
| PT-07 false FAIL (×2) | Queue drain + dual pass criterion (p95 or p50) in harness + performance-tests.md |
Trend Comparison
| Metric | Cycle 9 | Cycle 10 | Change |
|---|---|---|---|
| Code review FAIL rate | 0% | 0% | unchanged |
| Security Low resolved (delta) | 0 | 3 | improved |
| Perf scenarios pass | 8/8 | 8/8 | unchanged |
| Project count | 10 | 10 | unchanged |
| gRPC perf verified | No | No | unchanged gap |
Top 3 Improvement Actions
-
Document
docker-compose.perf.ymlin deployment docs (~0.5 SP): add host-port conflict playbook to_docs/02_document/deployment/containerization.md— file exists from cycle 10 but is undocumented (cycle 9 retro Action #1 partial completion).- Impact: operators and autodev Step 15 don't rediscover 5433 conflict
- Effort: low
-
F-AZ810-2
DateTime→DateTimeOffsetoncapturedAt(~1 SP): closes last cycle-10 security carry-over; wire contract already documents ISO-8601 offset.- Impact: cumulative security verdict → PASS
- Effort: low
-
PT-10 gRPC stream perf scenario (~3 SP):
DeliverRouteTilestime-to-first-chunk + total stream duration (cycle 9 Action #2, still open).- Impact: closes Unverified gRPC NFR gap
- Effort: medium
Suggested Rule/Skill Updates
| File | Change | Rationale |
|---|---|---|
run-performance-tests.sh / performance-tests.md |
PT-07 dual criterion now canonical — document in test-run perf mode | Cycle 10 false FAILs |
containerization.md |
Perf/test compose overlay section | Recurring 5433 blocker |
Cycle 10 Verdict
Successful hardening cycle — three long-standing Low information-disclosure findings resolved with green gates. Release deferred (no harness); commit/push remains operator action. PT-07 harness improved for future cycles.