Files
satellite-provider/_docs/03_implementation/deploy_cycle11.md
T
Oleksandr Bezdieniezhnykh a0449f79d0
ci/woodpecker/push/01-test Pipeline failed
ci/woodpecker/push/02-build-push unknown status
[AZ-1123] Cycle 11 closeout: traceability, deploy, retro
Co-authored-by: Cursor <cursoragent@cursor.com>
2026-06-26 11:08:24 +03:00

1.4 KiB
Raw Blame History

Deploy Report — Cycle 11 (AZ-1123)

Date: 2026-06-25 Cycle: 11 Scope: Document docker-compose.perf.yml host-port conflict playbook.

What is shipping

Code changes

None — documentation only.

Doc Change
deployment/containerization.md Compose overlays table + perf overlay command
tests/environment.md Perf orchestration row + cross-link
modules/tests_integration.md Pointer to overlay playbook

Database migrations

None.

Configuration changes

None.

Verification gates

Gate Result Evidence
Step 11 — Functional tests PASS 450/450 smoke EXIT:0
Step 12 — Test-Spec Sync PASS Traceability AZ-1123 AC-1..AC-3 (doc-verified)
Step 13 — Update Docs PASS ripple_log_cycle11.md, module doc pointer
Step 14 — Security Audit Skipped No code surface change
Step 15 — Performance Test Skipped No runtime change

Operator runbook

No deploy action required beyond pulling latest dev docs. Operators running Step 15 locally should use:

docker compose -f docker-compose.yml -f docker-compose.perf.yml up -d --build

when host port 5433 is occupied.

Release note

Step 16.5 (Release) skipped — no release harness (cycles 110 pattern).

Verdict: Cleared for retrospective (Step 17).