Cycle-3 retrospective:
- 6 tasks (AZ-491..AZ-496), 5 batches, 18 SP delivered.
- 100% code review pass rate (5/5 PASS_WITH_WARNINGS, 0 FAIL).
- 0 Critical/High/Medium review findings; 7 distinct Low.
- Security audit PASS_WITH_WARNINGS: 0 new Medium, 3 Low (all
test-only or operator-CLI), 2 Informational, 1 False Positive.
- Net Architecture delta: **-3** (F-AUTH-2 + D1 + D3 RESOLVED;
only new findings are Low test-side surfaces). First
net-negative cycle on record.
- 5 of 6 tasks completed first attempt (no post-review fix
commits). Cycle-2's 2 prior-retro actions all translated to
closed work (AZ-491 from Action 1, AZ-492 from Action 2,
AZ-493 from Action 3).
Top 3 cycle-4 improvement actions surfaced:
1. Execute the perf harness to capture PT-07/PT-08 baseline.
2. Bump TestSupport JWT pins 7.0.3 → 7.1.2+ (D4 NU1902 cleanup).
3. Add `workspace:` tag to cross-repo ACs in task-spec writing
and render them separately in the traceability matrix.
3 new ring-buffer lessons appended to _docs/LESSONS.md:
- [process] Option-B forcing functions for cross-team blockers.
- [process] ACs prescribing a measurement should also prescribe
the collection path.
- [process] Cross-repo-write ACs need workspace tags.
Structural snapshot at structure_2026-05-12_cycle3.md records the
new SatelliteProvider.TestSupport project (+2 ProjectReference edges
into it; no production-layer dependents) and the AZ-496 package
bumps (8.0.21 → 8.0.25).
Cycle 3 COMPLETE. State advanced to Step 9 (New Task) for cycle 4
per existing-code flow Re-Entry After Completion.