Update Dockerfile to use Bun for package management, remove package-lock.json, and adjust .gitignore to include it.

This commit is contained in:
Oleksandr Bezdieniezhnykh
2026-03-26 00:32:54 +02:00
parent 157a33096a
commit 4c7f479398
99 changed files with 11426 additions and 2626 deletions
@@ -0,0 +1,99 @@
# Risk Register Template
Use this template for risk assessment. Save as `_docs/02_document/risk_mitigations.md`.
Subsequent iterations: `risk_mitigations_02.md`, `risk_mitigations_03.md`, etc.
---
```markdown
# Risk Assessment — [Topic] — Iteration [##]
## Risk Scoring Matrix
| | Low Impact | Medium Impact | High Impact |
|--|------------|---------------|-------------|
| **High Probability** | Medium | High | Critical |
| **Medium Probability** | Low | Medium | High |
| **Low Probability** | Low | Low | Medium |
## Acceptance Criteria by Risk Level
| Level | Action Required |
|-------|----------------|
| Low | Accepted, monitored quarterly |
| Medium | Mitigation plan required before implementation |
| High | Mitigation + contingency plan required, reviewed weekly |
| Critical | Must be resolved before proceeding to next planning step |
## Risk Register
| ID | Risk | Category | Probability | Impact | Score | Mitigation | Owner | Status |
|----|------|----------|-------------|--------|-------|------------|-------|--------|
| R01 | [risk description] | [category] | High/Med/Low | High/Med/Low | Critical/High/Med/Low | [mitigation strategy] | [owner] | Open/Mitigated/Accepted |
| R02 | | | | | | | | |
## Risk Categories
### Technical Risks
- Technology choices may not meet requirements
- Integration complexity underestimated
- Performance targets unachievable
- Security vulnerabilities in design
- Data model cannot support future requirements
### Schedule Risks
- Dependencies delayed
- Scope creep from ambiguous requirements
- Underestimated complexity
### Resource Risks
- Key person dependency
- Team lacks experience with chosen technology
- Infrastructure not available in time
### External Risks
- Third-party API changes or deprecation
- Vendor reliability or pricing changes
- Regulatory or compliance changes
- Data source availability
## Detailed Risk Analysis
### R01: [Risk Title]
**Description**: [Detailed description of the risk]
**Trigger conditions**: [What would cause this risk to materialize]
**Affected components**: [List of components impacted]
**Mitigation strategy**:
1. [Action 1]
2. [Action 2]
**Contingency plan**: [What to do if mitigation fails]
**Residual risk after mitigation**: [Low/Medium/High]
**Documents updated**: [List architecture/component docs that were updated to reflect this mitigation]
---
### R02: [Risk Title]
(repeat structure above)
## Architecture/Component Changes Applied
| Risk ID | Document Modified | Change Description |
|---------|------------------|--------------------|
| R01 | `architecture.md` §3 | [what changed] |
| R01 | `components/02_[name]/description.md` §5 | [what changed] |
## Summary
**Total risks identified**: [N]
**Critical**: [N] | **High**: [N] | **Medium**: [N] | **Low**: [N]
**Risks mitigated this iteration**: [N]
**Risks requiring user decision**: [list]
```