[autodev] Cumulative review (batches 04-06) — PASS_WITH_WARNINGS
ci/woodpecker/push/build-arm Pipeline was successful

- 38/38 ACs covered across 12 tasks; no silent failures.
- 0 Critical, 0 High, 2 Low (drift backlog F-CUM-3 carried+
  extended; long-running soak gating F-CUM-4 — both bookkeeping
  for Phase B / Step 7).
- Phase 7: no production source mutated outside batch 4 test
  infrastructure; no new cyclic deps; F1-F9 baseline unchanged.
- LESSONS.md entry captures vi.stubGlobal('URL', ...) anti-
  pattern surfaced during AZ-476 debugging.
- Implement skill cleared to batch 7 (AZ-471, AZ-473, AZ-474,
  AZ-478, AZ-479, AZ-480 — 6 tasks remain).

Co-authored-by: Cursor <cursoragent@cursor.com>
This commit is contained in:
Oleksandr Bezdieniezhnykh
2026-05-11 05:23:53 +03:00
parent bd2b718ddf
commit 73e2cfb1eb
2 changed files with 220 additions and 7 deletions
+7 -7
View File
@@ -6,9 +6,9 @@ step: 6
name: Implement Tests
status: in_progress
sub_step:
phase: 14.5
name: cumulative-review-due
detail: "batch 6 complete; cumulative 04-06 due"
phase: 14
name: batch-loop
detail: "cumulative 04-06 PASS_WITH_WARNINGS; 6 tasks remain"
retry_count: 0
cycle: 1
tracker: jira
@@ -24,7 +24,7 @@ step_3_ac_gap_handling: rollback-to-6c (option A)
`_docs/00_problem/{problem,acceptance_criteria,restrictions,security_approach}.md`.
- Implement-skill batch reports at
`_docs/03_implementation/batch_0{1,2,3,4,5,6}_report.md`.
- Cumulative review (batches 01-03) PASS_WITH_WARNINGS at
`_docs/03_implementation/cumulative_review_batches_01-03_report.md`.
Next cumulative review (batches 04-06) due now per `implement/SKILL.md`
Step 14.5 (K=3 cadence).
- Cumulative reviews PASS_WITH_WARNINGS at
`_docs/03_implementation/cumulative_review_batches_01-03_report.md` and
`_docs/03_implementation/cumulative_review_batches_04-06_cycle1_report.md`.
Next cumulative review due after batch 9 (covers batches 07-09).