[AZ-512] Cycle 4 Steps 12-15: test-spec sync + docs + sec + perf
ci/woodpecker/push/build-arm Pipeline failed

Steps 12-15 closure for cycle 4 (AZ-512 admin class inline edit):

- Step 12 (Test-Spec Sync): traceability O9 -> Covered; new FT-P-62
  + FT-N-18 in blackbox-tests.md.
- Step 13 (Update Docs): AdminPage module doc gains the inline-edit
  state slots, four new handlers, PATCH integrations row, expanded
  i18n key list, tests section. architecture.md row 272 now lists
  PATCH /api/admin/classes/{id} with AZ-513 deploy-gate caveat.
- Step 14 (Security Audit): cycle-4 delta report records one new
  LOW finding (F-SAST-CY4-1 lost-update / mid-air-collision on
  PATCH, by design per spec); verdict carries PASS_WITH_WARNINGS;
  bun audit re-run clean.
- Step 15 (Performance Test): NFT-PERF-01 bundle = 291 332 B
  (+757 B / +0.26% vs cycle 3; ~13.89% of 2 MB budget); PASS.

Tests 243 passed / 13 skipped / 0 failed (+12 AZ-512 cases).

Co-authored-by: Cursor <cursoragent@cursor.com>
This commit is contained in:
Oleksandr Bezdieniezhnykh
2026-05-13 04:51:17 +03:00
parent ecacfa8b43
commit 873749197a
8 changed files with 385 additions and 13 deletions
+2
View File
@@ -1,6 +1,8 @@
# Security Audit Report — Azaion UI
> **AMENDMENT 2026-05-13 — verdict superseded by cycle-3 delta report.** See `_docs/05_security/security_report_cycle3_delta.md`. Current verdict (post AZ-510 + cycle-2-tail `bun update vite`): **PASS_WITH_WARNINGS** (was FAIL). All HIGH-severity dependency advisories closed; OWASP A06 → PASS, A07 → PASS. The HIGH-severity F-SAST-1 (`mission-planner/` Google Geocode API key in git history) remains open but does not affect the production browser bundle. The cycle-2 evidence below is preserved verbatim as the audit history of record.
>
> **AMENDMENT 2026-05-13 (cycle 4 — AZ-512)** — see `_docs/05_security/security_report_cycle4_delta.md`. Verdict carries: **PASS_WITH_WARNINGS** (unchanged). One new LOW finding (F-SAST-CY4-1 — lost-update / mid-air-collision admission on `PATCH /api/admin/classes/{id}`, by design per AZ-512 spec). No new dependencies; `bun audit` re-run clean. Implementation shipped against MSW stubs under user-authorized Option B; deploy gate to live admin/ stays open until AZ-513 lands.
**Date**: 2026-05-12
**Scope**: `src/` (production SPA), `mission-planner/src/` (port-source — in git history but NOT in production bundle), `nginx.conf`, `Dockerfile`, `.woodpecker/build-arm.yml`, `e2e/` harness, `.env.example` files