Closes cycle 4 (AZ-512 admin class inline edit).
Steps 16-17 artifacts:
- deploy_cycle4_report.md: ui/ dev pushed (09449bd..8737491, 4 commits,
fast-forward); stage/main and admin/ dev deferred at the push-scope
gate (option A; same as cycle 3). AZ-513 admin/ implementation +
deploy gate stays open as the cross-workspace prerequisite.
- retro_2026-05-13_cycle4.md: PASS_WITH_WARNINGS verdict carries;
243 PASS / 13 SKIP / 0 FAIL; bundle 291 332 B (+757 B / +0.26%);
net architecture delta 0; user-action backlog 7 -> 9 (rate
decelerating from +4 to +2); first cycle where the user explicitly
overrode a spec-conservative default (AZ-512 Option B).
- structure_2026-05-13_cycle4.md: identity-copy snapshot; no new
components, no new gates, no new barrels, no new wire-contract
assertions, no new architecture findings.
- LESSONS.md: top-3 cycle-4 lessons appended (testing/testing/process),
ring buffer at 12 of 15.
- _autodev_state.md: cycle 4 closed, cycle 5 entered awaiting New Task.
Jira AZ-512: In Testing -> Done with cycle-4 closing comment.
Co-authored-by: Cursor <cursoragent@cursor.com>