Oleksandr Bezdieniezhnykh
|
eef3bdf7db
|
[AZ-509][AZ-510][AZ-511] Cycle 3 closure: deploy + retro + state
Steps 16 (Deploy) and 17 (Retrospective) outputs for cycle 3.
- 03_implementation/deploy_cycle3_report.md — ui/ dev pushed
(15838c5..09449bd, 5 commits); stage/prod cutover deferred
per push-scope gate option A.
- 06_metrics/retro_2026-05-13_cycle3.md — cycle 3 retro: 6/9
pts shipped (AZ-510, AZ-511); AZ-512 deferred to backlog
at cross-workspace prereq gate (AZ-513 filed on admin/).
- 06_metrics/structure_2026-05-13.md — structural snapshot
referenced by retro.
- LESSONS.md — appended 3 cycle-3 lessons (process x2,
architecture x1).
- _autodev_state.md — cycle 3 closed; cycle 4 Step 9 not
started.
Co-authored-by: Cursor <cursoragent@cursor.com>
|
2026-05-13 04:15:37 +03:00 |
|