# Autodev State ## Current Step flow: existing-code step: 10 name: Implement status: in_progress sub_step: phase: 0 name: awaiting-invocation detail: "" retry_count: 0 cycle: 2 tracker: jira ## Notes - Cycle 1 (Phase B) CLOSED. Retro: `_docs/06_metrics/retro_2026-05-12.md` (+ `structure_2026-05-12.md`). Lessons appended to `_docs/LESSONS.md`. Steps 14, 15, 16 SKIPPED (character-identical structural refactor); no auth/wire/perf/deploy-relevant surface changed. - Cycle 2 Step 9 (New Task) COMPLETED. Epic AZ-497 created; Stories AZ-498 (tile swap, 5 pts) + AZ-499 (mission-planner OWM hardening, 2 pts) under it. Contract drafted at `_docs/02_document/contracts/satellite-provider/ tiles.md` (v1.0.0). Cross-workspace prereq for AZ-498: satellite-provider cookie-auth ticket (user-filed, not yet linked).