# Cycle 3 Step 16 — Deploy Report **Date**: 2026-05-13 **Cycle**: 3 (autodev existing-code Step 16) **Mode chosen**: real cutover (option A in the cycle-3 deploy gate) **Push scope chosen**: ui/ dev only (option A in the push-scope sub-gate; B/C/D not selected) **Outcome**: ui/ dev pushed; stage/prod cutover deferred to a later turn; admin/ dev NOT pushed. ## What was actually deployed | Repo | Branch | Commits pushed | Pipeline triggered | |------|--------|----------------|--------------------| | `ui/` | `dev` (`15838c5..09449bd`) | 5 | Woodpecker dev build for `ui/` | | `admin/` | — | 0 (locally ahead by 1) | none | ### Commits pushed to `ui/` `origin/dev` ``` 09449bd [AZ-510][AZ-511][AZ-512][AZ-513] Cycle 3 Steps 12-15 + admin prereq 6c7e297 [AZ-512] Defer to backlog at cross-workspace BLOCKING gate c368f60 [AZ-511] classColors carve-out to src/class-colors/ (closes F3) 70fb452 [AZ-510] Auth bootstrap: POST refresh + chained /users/me 098a556 [AZ-509][AZ-510][AZ-511][AZ-512] Cycle 3 new-task: epic + 3 task specs ``` ## What was NOT done (deferred / pending) | ID | Item | Reason | Owner | |----|------|--------|-------| | D-CY3-STAGE | `ui/` `dev → stage → push origin/stage` | User chose option A (dev-only) at the push-scope gate. Stage cutover deferred to a later autodev / manual run. | User | | D-CY3-MAIN | `ui/` `stage → main → push origin/main` (prod cutover) | Same reason as above. Devices will not auto-pull cycle-3 changes until this completes. | User | | D-CY3-ADMIN-PUSH | `admin/` `dev push origin/dev` | User did not select option D at the push-scope gate. The AZ-513 task spec sits locally on `admin/` `dev`. Docs-only commit — no admin/ build trigger expected even when pushed. | User | | D-CY3-AZ513-IMPL | Implementation of AZ-513 (admin/ POST + PATCH + DELETE /classes routes) | New cross-workspace dependency: admin/ workspace must implement before AZ-512 can ship. Filed in Jira (AZ-513, parent epic AZ-509, Blocks AZ-512). | admin/ team | ## Carry-forward from cycle 2 The cycle-2 `deploy_planning_sync_cycle2.md` deferred 3 items to leftovers in `_docs/_process_leftovers/2026-05-12_az-498-deploy-and-key-revocations.md`. Cycle 3 did NOT close any of them: | ID (cycle 2) | Item | Status as of 2026-05-13 | |----|------|-------| | L-AZ-498-DEPLOY | UI tile-swap prod cutover | Still deferred — cross-workspace satellite-provider gate unchanged; UI prod cutover would now ship cycle-3 + cycle-2 simultaneously. | | L-AZ-499-OWM-REVOKE | OWM key revocation at owm dashboard | Still pending — manual third-party action; owner: user. | | L-AZ-501-GOOGLE-REVOKE | Google Geocode key revocation at Google Cloud Console | Still pending — manual third-party action; owner: user. | These leftovers need a status sweep at the start of the next `/autodev` invocation per `tracker.mdc` Leftovers Mechanism. ## Cycle-3 deployment-doc deltas (NOT written this cycle) In strict autodev terms, Step 16 in this cycle was a real cutover (option A), not a planning sync. The cycle-2 pattern of patching `_docs/02_document/deployment/*` was therefore skipped here because: - AZ-510 and AZ-511 introduced **no** changes to Dockerfile, `.woodpecker/`, env vars, or nginx (verified via `git diff --stat 70fb452^..HEAD -- nginx.conf Dockerfile .woodpecker/ e2e/ .env.example mission-planner/.env.example` — empty). - AZ-510 wire-shape change is internal to the auth path; the production admin/ service already serves POST `/api/admin/auth/refresh` (used by the existing 401-retry path in `src/api/client.ts:88-99`) and `GET /api/admin/users/me`, so deployment-side configuration is already correct. - AZ-512 (deferred) introduced no source changes. If a future cycle adds env vars, infra changes, or new services, the cycle-2 planning-sync pattern (update `environment_strategy.md`, `ci_cd_pipeline.md`, `containerization.md`, `observability.md`) should be applied. ## Verification - `git push origin dev` for `ui/` returned `15838c5..09449bd dev -> dev` (5 commits, fast-forward). - `git status -sb` for `ui/` confirms `dev` and `origin/dev` are synced post-push (no `[ahead N]`). - Functional test suite green pre-push (231 passed, 13 quarantined skips — see `test-output/summary.csv` and `test-output/fast-report.xml`). - Static perf NFT-PERF-01 green pre-push (290 575 B gzipped vs ≤ 2 097 152 B threshold — see `test-output/performance-summary.txt`). - Security cycle-3 delta verdict PASS_WITH_WARNINGS pre-push (see `_docs/05_security/security_report_cycle3_delta.md`). - No nginx/Docker/CI config changes in cycle 3 (verified via `git diff --stat 70fb452^..HEAD -- nginx.conf Dockerfile .woodpecker/ e2e/ .env.example mission-planner/.env.example` empty). ## Auto-chain → Step 17 (Retrospective) for cycle 3.