# Autodev State ## Current Step flow: existing-code step: 11 name: Run Tests status: not_started sub_step: phase: 0 name: awaiting-invocation detail: "" retry_count: 0 cycle: 2 tracker: jira ## Notes - Cycle 1 (Phase B) CLOSED. Retro: `_docs/06_metrics/retro_2026-05-12.md` (+ `structure_2026-05-12.md`). Lessons appended to `_docs/LESSONS.md`. Steps 14, 15, 16 SKIPPED (character-identical structural refactor); no auth/wire/perf/deploy-relevant surface changed. - Cycle 2 Step 9 (New Task) COMPLETED. Epic AZ-497 created; Stories AZ-498 (tile swap, 5 pts) + AZ-499 (mission-planner OWM hardening, 2 pts) under it. Contract drafted at `_docs/02_document/contracts/satellite-provider/ tiles.md` (v1.0.0). Cross-workspace prereq for AZ-498: satellite-provider cookie-auth ticket (user-filed, not yet linked). - Cycle 2 Step 10 (Implement) COMPLETED. Single batch (batch_11) — both AZ-498 and AZ-499 implemented; +15 fast tests; +1 STC-SEC1C static check; review PASS_WITH_WARNINGS (1 Low). Spec drift recorded (AZ-498 AC-8 dropped, 4 missing files added in-scope, dead VITE_TILE_BASE_URL replaced). Pending USER ACTION: AZ-499 AC-7 (OWM key revocation at OWM dashboard). Pending CROSS-WORKSPACE: AZ-498 deploy gate (satellite-provider cookie-auth) at Step 16. Both tickets transitioned to "In Progress" in Jira; will move to "In Testing" with the commit. Reports at `_docs/03_implementation/batch_11_report.md` and `_docs/03_implementation/reviews/batch_11_review.md`.