Closes cycle 4 (AZ-512 admin class inline edit). Steps 16-17 artifacts: - deploy_cycle4_report.md: ui/ dev pushed (09449bd..8737491, 4 commits, fast-forward); stage/main and admin/ dev deferred at the push-scope gate (option A; same as cycle 3). AZ-513 admin/ implementation + deploy gate stays open as the cross-workspace prerequisite. - retro_2026-05-13_cycle4.md: PASS_WITH_WARNINGS verdict carries; 243 PASS / 13 SKIP / 0 FAIL; bundle 291 332 B (+757 B / +0.26%); net architecture delta 0; user-action backlog 7 -> 9 (rate decelerating from +4 to +2); first cycle where the user explicitly overrode a spec-conservative default (AZ-512 Option B). - structure_2026-05-13_cycle4.md: identity-copy snapshot; no new components, no new gates, no new barrels, no new wire-contract assertions, no new architecture findings. - LESSONS.md: top-3 cycle-4 lessons appended (testing/testing/process), ring buffer at 12 of 15. - _autodev_state.md: cycle 4 closed, cycle 5 entered awaiting New Task. Jira AZ-512: In Testing -> Done with cycle-4 closing comment. Co-authored-by: Cursor <cursoragent@cursor.com>
6.1 KiB
Cycle 4 Step 16 — Deploy Report
Date: 2026-05-13 Cycle: 4 (autodev existing-code Step 16) Mode chosen: real cutover (option A in the cycle-4 deploy gate — "Push to ui/ dev only") Outcome: ui/ dev pushed; stage/prod cutover deferred to a later turn; admin/ dev NOT pushed; cross-workspace AZ-513 still un-implemented.
What was actually deployed
| Repo | Branch | Commits pushed | Pipeline triggered |
|---|---|---|---|
ui/ |
dev (09449bd..8737491) |
4 | Woodpecker dev build for ui/ |
admin/ |
— | 0 | none |
Commits pushed to ui/ origin/dev
8737491 [AZ-512] Cycle 4 Steps 12-15: test-spec sync + docs + sec + perf
ecacfa8 [AZ-512] Admin class inline edit form + PATCH wiring (cy4 batch 16)
ef56d9c [AZ-512] chore: reactivate for cycle 4 (Option B path)
eef3bdf [AZ-509][AZ-510][AZ-511] Cycle 3 closure: deploy + retro + state
The cycle-3 closure commit eef3bdf was locally ahead since cycle 3's deploy step (deferred at the cycle-3 push-scope gate), and gets pushed now alongside cycle-4's three commits as a single fast-forward.
What was NOT done (deferred / pending)
| ID | Item | Reason | Owner |
|---|---|---|---|
| D-CY4-STAGE | ui/ dev → stage → push origin/stage |
User chose option A (dev-only) at the cycle-4 deploy gate. Stage cutover deferred. Will compound with cycle-3 stage deferral — when stage cutover lands, it will ship cycles 3 + 4 simultaneously. | User |
| D-CY4-MAIN | ui/ stage → main → push origin/main (prod cutover) |
Same reason. Devices will not auto-pull cycle-3 + cycle-4 changes until this completes. | User |
| D-CY4-AZ513-IMPL | Implementation of AZ-513 (admin/ POST + PATCH + DELETE /classes routes) | Cross-workspace dependency: admin/ workspace must implement before AZ-512 is functionally usable in any environment. Filed in Jira (AZ-513, parent epic AZ-509, Blocks AZ-512). UI ships with MSW-stubbed tests under user-authorized Option B — the live PATCH endpoint does not exist server-side yet, so the deployed ui/ dev build will surface admin.classes.updateFailed on real edits. |
admin/ team |
| D-CY4-ADMIN-PUSH | admin/ dev push origin/dev |
User did not select option C at the cycle-4 deploy gate. The AZ-513 task spec sits locally on admin/ dev (since cycle 3). |
User |
Carry-forward from cycles 2 and 3
Cycle 2's deploy_planning_sync_cycle2.md deferred 3 items to leftovers in _docs/_process_leftovers/2026-05-12_az-498-deploy-and-key-revocations.md. Cycle 3 did not close any of them. Cycle 4 also did not close them:
| ID (origin) | Item | Status as of 2026-05-13 (cycle 4 close) |
|---|---|---|
| L-AZ-498-DEPLOY | UI tile-swap prod cutover | Still deferred — cross-workspace satellite-provider gate unchanged. Will compound with cycle-3 + cycle-4 stage/prod deferrals when finally promoted. |
| L-AZ-499-OWM-REVOKE | OpenWeatherMap key revocation at owm dashboard | Still pending — manual third-party action; owner: user. |
| L-AZ-501-GOOGLE-REVOKE | Google Geocode key revocation at Google Cloud Console | Still pending — manual third-party action; owner: user. |
| L-AZ-512-ADMIN-PREREQ | AZ-513 implementation + ship in admin/ workspace |
Re-opened cycle 4 under user-authorized Option B. UI implementation now landed; gate stays open until admin/ AZ-513 ships AND deploys. |
These leftovers need a status sweep at the start of the next /autodev invocation per tracker.mdc Leftovers Mechanism.
Cycle-4 deployment-doc deltas (NOT written this cycle)
In strict autodev terms, Step 16 in this cycle was a real cutover (option A), not a planning sync. The cycle-2 pattern of patching _docs/02_document/deployment/* was therefore skipped here because:
- AZ-512 introduced no changes to Dockerfile,
.woodpecker/, env vars, ornginx.conf(verified inline during Step 14 security audit; the cycle-4 deltasecurity_report_cycle4_delta.mdenumerates the changed files). - AZ-512's only wire-shape change is one new HTTP method on an existing URL (
PATCH /api/admin/classes/{id}— already routed toadmin/bynginx.confsince cycle 2 becauseDELETE /api/admin/classes/{id}was already proxied through the same route block). - No new env vars, no new container, no new exposed port.
If a future cycle adds env vars, infra changes, or new services, the cycle-2 planning-sync pattern (update environment_strategy.md, ci_cd_pipeline.md, containerization.md, observability.md) should be applied.
Verification
git push origin devforui/returned09449bd..8737491 dev -> dev(4 commits, fast-forward).git status -sbforui/confirmsdevandorigin/devare synced post-push (no[ahead N]).- Functional test suite green pre-push (243 passed, 13 quarantined skips, 0 failed — see
test-output/summary.csvandtest-output/fast-report.xml). Up +12 vs cycle 3 from the newtests/admin_class_edit.test.tsxsuite. - Static perf NFT-PERF-01 green pre-push (291 332 B gzipped vs ≤ 2 097 152 B threshold — see
test-output/performance-summary.txtand_docs/06_metrics/perf_2026-05-13_cycle4.md). - Security cycle-4 delta verdict PASS_WITH_WARNINGS pre-push (see
_docs/05_security/security_report_cycle4_delta.md). - No nginx/Docker/CI config changes in cycle 4.
- Cross-workspace deploy gate (AZ-513) explicitly acknowledged and re-recorded in this report and in the leftover entry. The deployed UI on
ui/dev will returnadmin.classes.updateFailedon real PATCH attempts untiladmin/AZ-513 ships — by design under user-authorized Option B.
Cycle-3 → cycle-4 push-scope progression
Cycle 3 deploy gate: user picked option A (ui/ dev only). Cycle 4 deploy gate: user picked option A again (ui/ dev only). The same trade-off applies — stage/prod cutover is being collected for a single later promotion. Two consecutive cycles of dev-only pushes means the eventual stage promotion will batch AZ-510 + AZ-511 + AZ-512 deltas into one stage build, with the additional gate that AZ-513 must have shipped in admin/ by that time (otherwise the AZ-512 edit feature renders but cannot complete saves).
Auto-chain
→ Step 17 (Retrospective) for cycle 4.