Oleksandr Bezdieniezhnykh 6c7e29722f [AZ-512] Defer to backlog at cross-workspace BLOCKING gate
AZ-512 (Admin edit detection class) hit its spec-defined Cross-Workspace
Verification gate during cycle 3 batch 15. The admin/ service
(Azaion.AdminApi/Program.cs) exposes /login, /users*, /resources* only — no
/classes routes exist, so neither the PATCH this task needs nor the
POST/DELETE that AdminPage.tsx already calls today are wired end-to-end.

Per the spec's Choose A/B/C (user skipped, defaulted to A): file a
prerequisite ticket on admin/ and pause AZ-512 in backlog/. AZ-510 + AZ-511
already shipped this cycle; cycle 3 closes with 6 of 9 points delivered.

- Move AZ-512 spec from todo/ to backlog/ with a STATUS banner.
- Add Jira comment on AZ-512 documenting the blocker + replay path.
- Write leftover record _docs/_process_leftovers/2026-05-13_az-512-...
  capturing the full prerequisite payload (suggested ticket summary,
  description, ACs, story points) and the side observation that the
  existing add+delete affordances on the Detection Classes table are
  also broken end-to-end against admin/ (pre-existing bug, NOT
  introduced by cycle 3).
- Write batch 15 deferral report.
- Write Product Implementation Completeness Gate report (PASS for
  AZ-510 + AZ-511; AZ-512 deferred is outside the gate's scope).
- Write final cycle 3 implementation report with handoff to Step 11.
- Advance state: step 10 -> step 11 (Run Tests).

Co-authored-by: Cursor <cursoragent@cursor.com>
2026-05-13 03:16:39 +03:00

569 B

Autodev State

Current Step

flow: existing-code step: 11 name: Run Tests status: not_started sub_step: phase: 0 name: awaiting-invocation detail: "" retry_count: 0 cycle: 3 tracker: jira

Notes

  • Cycle 3 Step 10 (Implement) shipped 6 of 9 points: AZ-510 + AZ-511 done; AZ-512 deferred to backlog/ at its BLOCKING cross-workspace verification gate (admin/ workspace lacks the prerequisite /classes routes). Leftover: _docs/_process_leftovers/2026-05-13_az-512-admin-classes-prereq.md.
  • Cycle 2 leftovers still pending (deploy + manual key revocations).