Files
ui/_docs/03_implementation/implementation_report_tests.md
T
Oleksandr Bezdieniezhnykh 2ea8d3ebdf
ci/woodpecker/push/build-arm Pipeline was successful
[AZ-455] Step 6 close: implementation_report_tests.md + advance to Step 7
Final test-implementation report with handoff to test-run
skill per implement skill Step 16 (next flow step is Run
Tests; let test-run own the full-suite gate to avoid
duplicate runs).

27 test tasks delivered across 8 batches (1 + 4*6 + 4 + 2);
0 production source mutations; 26/26 ACs covered; 23
production drifts pinned to runnable contract tests; 29
commit-time static gates active (up from 13 at baseline).

State: existing-code Step 7 (Run Tests), not_started.

Co-authored-by: Cursor <cursoragent@cursor.com>
2026-05-11 06:18:10 +03:00

4.6 KiB
Raw Blame History

Test Implementation — Final Report

Cycle: Phase A baseline (cycle 1) Step: existing-code Step 6 — Implement Tests Date: 2026-05-11 Final commit: c16c9d8 on dev (cumulative review batches 0708); test-implementation tip: f245194 (batch 8)

Scope

This report covers test implementation only. The 7 testability-refactor tasks (AZ-448..AZ-454) ran under the refactor skill (Step 4) and have their own report in _docs/04_refactoring/01-testability-refactoring/.

Summary

  • 27 test tasks delivered across 8 batches (AZ-456 + AZ-457..AZ-482; 1 test-infrastructure + 26 blackbox-test tasks).
  • 0 production source files mutated — the entire run stayed inside the Blackbox Tests envelope (tests/** + e2e/** + src/**/*.test.{ts,tsx} + selected static-check artefacts).
  • All 26 task ACs covered with a runnable test (every AC has either a PASS contract test, an it.fails() drift assertion paired with a control, or a quarantined skip with a documented flip condition).
  • 23 production drifts catalogued and pinned to runnable contract tests; each test flips green automatically when the matching production fix lands. Drift backlog summarised in _docs/03_implementation/cumulative_review_batches_07-08_cycle1_report.md finding F-CUM-5.
  • 29 commit-time static gates active (up from 13 at baseline 729ad1c). New IDs: STC-SEC1B, STC-SEC2..STC-SEC4, STC-SEC7, STC-SEC8, STC-SEC13, STC-SEC14, STC-FN15, STC-FP22, STC-FP23, STC-CI11, STC-PERF01, STC-RES02, STC-RES03, STC-RES09, STC-RES10.

Per-Batch Outcomes

Batch Date Tasks Pts Code-review Notes
1 2026-05-11 AZ-456 5 PASS MSW boundary + helpers + fixtures + setup
2 2026-05-11 AZ-457, AZ-459, AZ-465, AZ-481 13 PASS Auth + enum wire contract + i18n + CI labels
3 2026-05-11 AZ-458, AZ-467, AZ-468, AZ-482 13 PASS SSE lifecycle + RBAC + Header dropdown + secrets/banned
4 2026-05-11 AZ-460, AZ-462, AZ-466, AZ-475 11 PASS Annotation save + overlay + ConfirmDialog + form hygiene
5 2026-05-11 AZ-461, AZ-464, AZ-470, AZ-472 12 PASS Detect + bulk-validate + panel-width + class hotkeys
6 2026-05-11 AZ-463, AZ-469, AZ-476, AZ-477 12 PASS Flight persistence + browser-support + 413 + settings resilience
7 2026-05-11 AZ-471, AZ-473, AZ-478, AZ-479 13 PASS Canvas editor + photo mode + network resilience + bundle/FCP/soak
8 2026-05-11 AZ-474, AZ-480 6 PASS Tile-split + prod nginx/image (Phase A close)

Total: 85 pts across 27 tasks. Cumulative reviews at K=3 cadence:

  • cumulative_review_batches_01-03_report.md (PASS_WITH_WARNINGS — F-CUM-1, F-CUM-2)
  • cumulative_review_batches_04-06_cycle1_report.md (PASS_WITH_WARNINGS — F-CUM-3, F-CUM-4)
  • cumulative_review_batches_07-08_cycle1_report.md (PASS_WITH_WARNINGS — F-CUM-5, F-CUM-4 carry-over; cycle close)

Final Test-Suite Status (handoff to Step 7)

The implement skill's Step 16 (Final Test Run) is handed off to .cursor/skills/test-run/SKILL.md per the implement skill's Step 16 rule:

If the next flow step is Run Tests, record a handoff in the final implementation report and let test-run/SKILL.md own the full-suite gate to avoid duplicate full runs.

The next autodev step is Step 7 (Run Tests), so the full-suite gate is delegated.

For visibility (most recent batch-end run, host machine, batch-8 close):

  • bun run test:fast — 26 files / 163 PASS / 13 SKIP / ~16.4 s wall.
  • ./scripts/run-tests.sh --static-only — 29 / 29 PASS / ~13 s wall.
  • bun run e2e — not yet run end-to-end since batch 7's introduction of the suite-e2e perf lane and batch 8's docker-host probes; this is exactly the work test-run skill picks up at Step 7.

Open Items Carried into Step 7

  • F-CUM-5 production-drift backlog (23 entries) — non-blocking; routed to Phase B / Step 9 (New Task) per cumulative_review_batches_07-08_cycle1_report.md.
  • F-CUM-4 long-running soak gating mechanism (still env-flag-only; spec calls for @long-running Playwright config grep filter) — non-blocking; should be folded into the test-run skill's Step 14 lane configuration if it surfaces a CI-lane question.

Tracker Status

All 27 test tickets transitioned to In Testing in Jira (project AZ). Per the autodev tracker rule, transitioning to Done is owned by Step 7 (Run Tests) once the full-suite gate confirms each ticket's contract holds end-to-end.

Step 6 Closure

Step 6 is complete. Auto-chain to Step 7 (Run Tests) per the existing-code flow.