Final test-implementation report with handoff to test-run skill per implement skill Step 16 (next flow step is Run Tests; let test-run own the full-suite gate to avoid duplicate runs). 27 test tasks delivered across 8 batches (1 + 4*6 + 4 + 2); 0 production source mutations; 26/26 ACs covered; 23 production drifts pinned to runnable contract tests; 29 commit-time static gates active (up from 13 at baseline). State: existing-code Step 7 (Run Tests), not_started. Co-authored-by: Cursor <cursoragent@cursor.com>
4.6 KiB
Test Implementation — Final Report
Cycle: Phase A baseline (cycle 1)
Step: existing-code Step 6 — Implement Tests
Date: 2026-05-11
Final commit: c16c9d8 on dev (cumulative review batches 07–08); test-implementation tip: f245194 (batch 8)
Scope
This report covers test implementation only. The 7 testability-refactor tasks (AZ-448..AZ-454) ran under the refactor skill (Step 4) and have their own report in _docs/04_refactoring/01-testability-refactoring/.
Summary
- 27 test tasks delivered across 8 batches (AZ-456 + AZ-457..AZ-482; 1 test-infrastructure + 26 blackbox-test tasks).
- 0 production source files mutated — the entire run stayed inside the
Blackbox Testsenvelope (tests/**+e2e/**+src/**/*.test.{ts,tsx}+ selected static-check artefacts). - All 26 task ACs covered with a runnable test (every AC has either a PASS contract test, an
it.fails()drift assertion paired with a control, or a quarantined skip with a documented flip condition). - 23 production drifts catalogued and pinned to runnable contract tests; each test flips green automatically when the matching production fix lands. Drift backlog summarised in
_docs/03_implementation/cumulative_review_batches_07-08_cycle1_report.mdfinding F-CUM-5. - 29 commit-time static gates active (up from 13 at baseline
729ad1c). New IDs:STC-SEC1B,STC-SEC2..STC-SEC4,STC-SEC7,STC-SEC8,STC-SEC13,STC-SEC14,STC-FN15,STC-FP22,STC-FP23,STC-CI11,STC-PERF01,STC-RES02,STC-RES03,STC-RES09,STC-RES10.
Per-Batch Outcomes
| Batch | Date | Tasks | Pts | Code-review | Notes |
|---|---|---|---|---|---|
| 1 | 2026-05-11 | AZ-456 | 5 | PASS | MSW boundary + helpers + fixtures + setup |
| 2 | 2026-05-11 | AZ-457, AZ-459, AZ-465, AZ-481 | 13 | PASS | Auth + enum wire contract + i18n + CI labels |
| 3 | 2026-05-11 | AZ-458, AZ-467, AZ-468, AZ-482 | 13 | PASS | SSE lifecycle + RBAC + Header dropdown + secrets/banned |
| 4 | 2026-05-11 | AZ-460, AZ-462, AZ-466, AZ-475 | 11 | PASS | Annotation save + overlay + ConfirmDialog + form hygiene |
| 5 | 2026-05-11 | AZ-461, AZ-464, AZ-470, AZ-472 | 12 | PASS | Detect + bulk-validate + panel-width + class hotkeys |
| 6 | 2026-05-11 | AZ-463, AZ-469, AZ-476, AZ-477 | 12 | PASS | Flight persistence + browser-support + 413 + settings resilience |
| 7 | 2026-05-11 | AZ-471, AZ-473, AZ-478, AZ-479 | 13 | PASS | Canvas editor + photo mode + network resilience + bundle/FCP/soak |
| 8 | 2026-05-11 | AZ-474, AZ-480 | 6 | PASS | Tile-split + prod nginx/image (Phase A close) |
Total: 85 pts across 27 tasks. Cumulative reviews at K=3 cadence:
cumulative_review_batches_01-03_report.md(PASS_WITH_WARNINGS — F-CUM-1, F-CUM-2)cumulative_review_batches_04-06_cycle1_report.md(PASS_WITH_WARNINGS — F-CUM-3, F-CUM-4)cumulative_review_batches_07-08_cycle1_report.md(PASS_WITH_WARNINGS — F-CUM-5, F-CUM-4 carry-over; cycle close)
Final Test-Suite Status (handoff to Step 7)
The implement skill's Step 16 (Final Test Run) is handed off to .cursor/skills/test-run/SKILL.md per the implement skill's Step 16 rule:
If the next flow step is
Run Tests, record a handoff in the final implementation report and lettest-run/SKILL.mdown the full-suite gate to avoid duplicate full runs.
The next autodev step is Step 7 (Run Tests), so the full-suite gate is delegated.
For visibility (most recent batch-end run, host machine, batch-8 close):
bun run test:fast— 26 files / 163 PASS / 13 SKIP / ~16.4 s wall../scripts/run-tests.sh --static-only— 29 / 29 PASS / ~13 s wall.bun run e2e— not yet run end-to-end since batch 7's introduction of the suite-e2e perf lane and batch 8's docker-host probes; this is exactly the work test-run skill picks up at Step 7.
Open Items Carried into Step 7
- F-CUM-5 production-drift backlog (23 entries) — non-blocking; routed to Phase B / Step 9 (New Task) per
cumulative_review_batches_07-08_cycle1_report.md. - F-CUM-4 long-running soak gating mechanism (still env-flag-only; spec calls for
@long-runningPlaywright config grep filter) — non-blocking; should be folded into the test-run skill's Step 1–4 lane configuration if it surfaces a CI-lane question.
Tracker Status
All 27 test tickets transitioned to In Testing in Jira (project AZ). Per the autodev tracker rule, transitioning to Done is owned by Step 7 (Run Tests) once the full-suite gate confirms each ticket's contract holds end-to-end.
Step 6 Closure
Step 6 is complete. Auto-chain to Step 7 (Run Tests) per the existing-code flow.