Steps 16 (Deploy) and 17 (Retrospective) outputs for cycle 3. - 03_implementation/deploy_cycle3_report.md — ui/ dev pushed (15838c5..09449bd, 5 commits); stage/prod cutover deferred per push-scope gate option A. - 06_metrics/retro_2026-05-13_cycle3.md — cycle 3 retro: 6/9 pts shipped (AZ-510, AZ-511); AZ-512 deferred to backlog at cross-workspace prereq gate (AZ-513 filed on admin/). - 06_metrics/structure_2026-05-13.md — structural snapshot referenced by retro. - LESSONS.md — appended 3 cycle-3 lessons (process x2, architecture x1). - _autodev_state.md — cycle 3 closed; cycle 4 Step 9 not started. Co-authored-by: Cursor <cursoragent@cursor.com>
4.7 KiB
Cycle 3 Step 16 — Deploy Report
Date: 2026-05-13 Cycle: 3 (autodev existing-code Step 16) Mode chosen: real cutover (option A in the cycle-3 deploy gate) Push scope chosen: ui/ dev only (option A in the push-scope sub-gate; B/C/D not selected) Outcome: ui/ dev pushed; stage/prod cutover deferred to a later turn; admin/ dev NOT pushed.
What was actually deployed
| Repo | Branch | Commits pushed | Pipeline triggered |
|---|---|---|---|
ui/ |
dev (15838c5..09449bd) |
5 | Woodpecker dev build for ui/ |
admin/ |
— | 0 (locally ahead by 1) | none |
Commits pushed to ui/ origin/dev
09449bd [AZ-510][AZ-511][AZ-512][AZ-513] Cycle 3 Steps 12-15 + admin prereq
6c7e297 [AZ-512] Defer to backlog at cross-workspace BLOCKING gate
c368f60 [AZ-511] classColors carve-out to src/class-colors/ (closes F3)
70fb452 [AZ-510] Auth bootstrap: POST refresh + chained /users/me
098a556 [AZ-509][AZ-510][AZ-511][AZ-512] Cycle 3 new-task: epic + 3 task specs
What was NOT done (deferred / pending)
| ID | Item | Reason | Owner |
|---|---|---|---|
| D-CY3-STAGE | ui/ dev → stage → push origin/stage |
User chose option A (dev-only) at the push-scope gate. Stage cutover deferred to a later autodev / manual run. | User |
| D-CY3-MAIN | ui/ stage → main → push origin/main (prod cutover) |
Same reason as above. Devices will not auto-pull cycle-3 changes until this completes. | User |
| D-CY3-ADMIN-PUSH | admin/ dev push origin/dev |
User did not select option D at the push-scope gate. The AZ-513 task spec sits locally on admin/ dev. Docs-only commit — no admin/ build trigger expected even when pushed. |
User |
| D-CY3-AZ513-IMPL | Implementation of AZ-513 (admin/ POST + PATCH + DELETE /classes routes) | New cross-workspace dependency: admin/ workspace must implement before AZ-512 can ship. Filed in Jira (AZ-513, parent epic AZ-509, Blocks AZ-512). | admin/ team |
Carry-forward from cycle 2
The cycle-2 deploy_planning_sync_cycle2.md deferred 3 items to leftovers in _docs/_process_leftovers/2026-05-12_az-498-deploy-and-key-revocations.md. Cycle 3 did NOT close any of them:
| ID (cycle 2) | Item | Status as of 2026-05-13 |
|---|---|---|
| L-AZ-498-DEPLOY | UI tile-swap prod cutover | Still deferred — cross-workspace satellite-provider gate unchanged; UI prod cutover would now ship cycle-3 + cycle-2 simultaneously. |
| L-AZ-499-OWM-REVOKE | OWM key revocation at owm dashboard | Still pending — manual third-party action; owner: user. |
| L-AZ-501-GOOGLE-REVOKE | Google Geocode key revocation at Google Cloud Console | Still pending — manual third-party action; owner: user. |
These leftovers need a status sweep at the start of the next /autodev invocation per tracker.mdc Leftovers Mechanism.
Cycle-3 deployment-doc deltas (NOT written this cycle)
In strict autodev terms, Step 16 in this cycle was a real cutover (option A), not a planning sync. The cycle-2 pattern of patching _docs/02_document/deployment/* was therefore skipped here because:
- AZ-510 and AZ-511 introduced no changes to Dockerfile,
.woodpecker/, env vars, or nginx (verified viagit diff --stat 70fb452^..HEAD -- nginx.conf Dockerfile .woodpecker/ e2e/ .env.example mission-planner/.env.example— empty). - AZ-510 wire-shape change is internal to the auth path; the production admin/ service already serves POST
/api/admin/auth/refresh(used by the existing 401-retry path insrc/api/client.ts:88-99) andGET /api/admin/users/me, so deployment-side configuration is already correct. - AZ-512 (deferred) introduced no source changes.
If a future cycle adds env vars, infra changes, or new services, the cycle-2 planning-sync pattern (update environment_strategy.md, ci_cd_pipeline.md, containerization.md, observability.md) should be applied.
Verification
git push origin devforui/returned15838c5..09449bd dev -> dev(5 commits, fast-forward).git status -sbforui/confirmsdevandorigin/devare synced post-push (no[ahead N]).- Functional test suite green pre-push (231 passed, 13 quarantined skips — see
test-output/summary.csvandtest-output/fast-report.xml). - Static perf NFT-PERF-01 green pre-push (290 575 B gzipped vs ≤ 2 097 152 B threshold — see
test-output/performance-summary.txt). - Security cycle-3 delta verdict PASS_WITH_WARNINGS pre-push (see
_docs/05_security/security_report_cycle3_delta.md). - No nginx/Docker/CI config changes in cycle 3 (verified via
git diff --stat 70fb452^..HEAD -- nginx.conf Dockerfile .woodpecker/ e2e/ .env.example mission-planner/.env.exampleempty).
Auto-chain
→ Step 17 (Retrospective) for cycle 3.