# Phase 6: Final Verification
**Role**: QA engineer
**Goal**: Run all tests end-to-end, compare final metrics against baseline, and confirm the refactoring succeeded
**Constraints**: No code changes. If failures are found, go back to the appropriate phase (4/5) to fix before retrying.
**Skip condition**: If the run name contains `testability`, skip Phase 6 entirely — no test suite exists yet to verify against. Proceed directly to Phase 7.
## 6a. Run Full Test Suite
1. Run unit tests, integration tests, and blackbox tests
2. Run acceptance tests derived from `acceptance_criteria.md`
3. Record pass/fail counts and any failures
If any test fails:
- Determine whether the failure is a test issue (→ return to Phase 5) or a code issue (→ return to Phase 4)
- Do NOT proceed until all tests pass
## 6b. Capture Final Metrics
Re-measure all metrics from Phase 0 baseline using the same tools:
| Metric Category | What to Capture |
|----------------|-----------------|
| **Coverage** | Overall, unit, blackbox, critical paths |
| **Complexity** | Cyclomatic complexity (avg + top 5 functions), LOC, tech debt ratio |
| **Code Smells** | Total, critical, major |
| **Performance** | Response times (P50/P95/P99), CPU/memory, throughput |
| **Dependencies** | Total count, outdated, security vulnerabilities |
| **Build** | Build time, test execution time, deployment time |
## 6c. Compare Against Baseline
1. Read `RUN_DIR/baseline_metrics.md`
2. Produce a side-by-side comparison: baseline vs final for every metric
3. Flag any regressions (metrics that got worse)
4. Verify acceptance criteria are met
Write `RUN_DIR/verification_report.md`:
- Test results summary: total, passed, failed, skipped
- Metric comparison table: metric, baseline value, final value, delta, status (improved / unchanged / regressed)
- Acceptance criteria checklist: criterion, status (met / not met), evidence
- Regressions (if any): metric, severity, explanation
**Self-verification**:
- [ ] All tests pass (zero failures)
- [ ] All acceptance criteria are met
- [ ] No critical metric regressions
- [ ] Metrics are captured with the same tools/methodology as Phase 0
**Save action**: Write `RUN_DIR/verification_report.md`
**GATE (BLOCKING)**: All tests must pass and no critical regressions. Present verification report to user. Do NOT proceed to Phase 7 until user confirms.