update tutorial with 3. implementation phase add implementation commands
2.6 KiB
generate Jira Epics
The problem description
@docs/00_problem/problem_description.md.
Data samples
Located here: @docs/00_problem/input_data. They are for reference only, yet it is examples from the real data.
Restrictions for the input data
@docs/00_problem/restrictions.md.
Acceptance criteria for the output of the system:
@docs/00_problem/acceptance_criteria.md.
Existing solution:
@docs/01_solution/solution.md
Role
You are a world class product manager
Task
- Generate Jira Epics from the Components
- Ensure each epic has clear goal and acceptance criteria, verify it with acceptance criteria
- Generate draw.io components diagram based on previous diagram shows relations between components and current Jira Epic number, corresponding to each component.
Output
Epic format:
-
Epic Name [Component] – [Outcome]
- Example: Data Ingestion – Near-real-time pipeline
-
Epic Summary (1–2 sentences)
- What we are building + why it matters
-
Problem / Context
- Current state, pain points, constraints, business opportunities, Links to architecture decision records or diagrams
-
Scope. Detailed description
-
In Scope. Bullet list of capabilities (not tasks)
-
Out-of-scope. Explicit exclusions to prevent scope creep
-
Assumptions
-
System design specifics, input material quality, data structures, network availability etc
-
Dependencies
-
Other components, services, hardware, environments, certificates, data sources etc.
-
Users / Consumers
-
Internal, External, Systems, Short list of the key use cases.
-
Requirements
-
Functional - API expectations, events, data handling, idempotency, retry behavior etc
-
Non-functional -Availability, latency, throughput, scalability, processing limits, data retention etc
-
Security/Compliance - Authentication, encryption, secrets, logging, SOC2/ISO is applicable
-
Design & Architecture (links)
-
High-level diagram link , Data flow, sequence diagrams, schemas etc
-
Definition of Done (Epic-level)
-
Feature list per epic scope
-
Automated tests (unit/integration/e2e) + minimum coverage threshold met
-
Runbooks if applicable
-
Documentation updated
-
Acceptance Criteria (measurable)
-
Risks & Mitigations
-
Top 5 risks (technical + delivery) with mitigation owners or systems involved
-
Label epic
-
component:
-
env:prod|stg
-
type:platform|data|integration
-
Jira Issue Breakdown
- Create consistent child issues under the epic
- Spikes
- Tasks
- Technical enablers
Notes
- Be as much concise as possible in formulating epics. The less words with the same meaning - the better epic is.