[AZ-835] [AZ-777] Decompose Epic into C3-C6 + close AZ-777

AZ-839 (C3, 5pt) operator_pre_flight_setup real fixture: wire
C1+C2+C11+C10, supersedes AZ-777 Phase 3 (route-driven, not bbox).
AZ-840 (C4, 3pt) E2E orchestrator test ingesting raw
(tlog, video, calibration), runs steps 1-7 end-to-end on Jetson.
AZ-841 (C5, 1pt) Un-xfail AZ-777 AC-4 + AC-5 once C3 + C4 land.
AZ-842 (C6, 2pt) Docs: replay_protocol Invariant 12 + architecture
+ orchestrator-test README.

AZ-777 transitioned to Done in Jira (Phases 1+2 shipped batches
104-106; Phases 3-5 superseded per 2026-05-22 route-driven
directive). Closure comment 11177 added with phase-by-phase status.
Local spec moved todo/ -> done/ with a status banner at the top.

Dependencies table preamble bumped to 173 tasks / 557 SP and a
2026-05-23 entry prepended. Autodev state sub_step.detail set to
"batch 108 next; AZ-839 C3".

Co-authored-by: Cursor <cursoragent@cursor.com>
This commit is contained in:
Oleksandr Bezdieniezhnykh
2026-05-23 14:02:53 +03:00
parent 7eed4d6e76
commit 0ed1a5d988
7 changed files with 306 additions and 4 deletions
File diff suppressed because one or more lines are too long