[AZ-842] Tracker-only: fix Jira-vs-local drift (ticket stuck in To Do)
AZ-842 work was shipped 2026-05-29 in commit 42b1db6 (spec in
done/, Invariant 14 + cycle-4 redesign narrative landed in
replay_protocol.md, architecture.md, tests/e2e/replay/README.md)
but the Jira ticket was never transitioned out of To Do.
Discovered when batch-planning surfaced AZ-842 as a candidate;
my own eighth-bump dep-table narrative incorrectly listed AZ-842
in "cycle-4 todo/ remainder" alongside AZ-899/900/901.
Fixed by:
- Jira: AZ-842 To Do -> In Progress -> Done, read-back verified.
- dep-table preamble: ninth bump documents the drift discovery
and corrects the cycle-4 todo/ remainder to AZ-899 + AZ-900 +
AZ-901 = 3 SP (was incorrectly stated as 6 SP).
- state.md: batch 8 records the tracker-only fix.
No code changes — the work itself was already on disk.
Co-authored-by: Cursor <cursoragent@cursor.com>
This commit is contained in:
File diff suppressed because one or more lines are too long
@@ -8,7 +8,7 @@ status: in_progress
|
||||
sub_step:
|
||||
phase: 6
|
||||
name: implement-tasks
|
||||
detail: "batch 7 complete: AZ-961 ReportContext.tlog_path → ground_truth_path rename + label fix landed (62/62 tests green; rendered report now reads '- Ground truth: <path>' for both tlog and CSV runs). The CSV-replay-input chain (AZ-959 + AZ-960 + AZ-961) is now coherent and unblocks the relocated AZ-897 UI in ../ui. Cycle-4 todo/ remainder for next batches: AZ-842 (3, docs) + AZ-899 (1) + AZ-900 (1) + AZ-901 (1) = 6 SP product. OKVIS2 chain (AZ-943 + AZ-951 + AZ-952) sits in todo/ but is sequenced after the Derkachi e2e flight test passes per user 2026-05-29 directive."
|
||||
detail: "batch 8 = tracker-only fix for AZ-842 drift (work already shipped 2026-05-29 in commit 42b1db6; Jira ticket was stuck in To Do; transitioned To Do → In Progress → Done with read-back verified). Corrected cycle-4 todo/ remainder: AZ-899 (1) + AZ-900 (1) + AZ-901 (1) = 3 SP product (down from 6 — AZ-842 erroneously listed by my earlier eighth-bump preamble narrative). OKVIS2 chain (AZ-943 + AZ-951 + AZ-952) sits in todo/ but is sequenced after the Derkachi e2e flight test passes per user 2026-05-29 directive."
|
||||
retry_count: 0
|
||||
cycle: 4
|
||||
tracker: jira
|
||||
|
||||