[AZ-960] [AZ-961] File AZ-959 follow-up tickets as cycle-4 todo/ items

Per user 2026-05-29 directive ("File AZ-960 + AZ-961 and continue
with one of them next"), the two deferred items surfaced during
AZ-959 implementation are now tracked:

- AZ-960 (2pt, todo/): render-map --truth dispatch on extension so
  CSV-path replay jobs ship with a map link. Removes the AZ-959
  short-circuit in _maybe_render_map. Deps: AZ-700 + AZ-894 + AZ-959.
- AZ-961 (1pt, todo/): ReportContext.tlog_path → ground_truth_path
  rename + label fix in rendered report so CSV runs stop saying
  "Tlog: <csv_path>". Deps: AZ-699 + AZ-959.

Sequencing: AZ-960 next (closes the UX gap), AZ-961 after to avoid
re-conflict on _maybe_render_report kwargs.

Touches: 2 local spec files in todo/, dep-table preamble sixth bump
narrative, state.md batch detail update.

Co-authored-by: Cursor <cursoragent@cursor.com>
This commit is contained in:
Oleksandr Bezdieniezhnykh
2026-05-29 12:50:45 +03:00
parent 1d18e25cf4
commit 363c235264
4 changed files with 108 additions and 2 deletions
+1 -1
View File
@@ -8,7 +8,7 @@ status: in_progress
sub_step:
phase: 6
name: implement-tasks
detail: "batch 5 complete: AZ-959 replay_api POST /replay CSV-path extension landed (27/27 unit tests green, all 7 ACs covered: CSV happy path + XOR validation + malformed-CSV reject + /static/example-csv + CSV ground-truth dispatch in SubprocessReplayRunner._maybe_render_report + AZ-701 tlog tests unchanged). Map rendering for CSV path skipped (gps-denied-render-map only supports tlog truth today; deferred to AZ-700 follow-up). ReportContext.tlog_path field widened in-place to 'ground-truth source path' for the CSV case; the cosmetic 'Tlog:' label in the rendered report is now misleading for CSV runs (note for user — AZ-699 follow-up territory). Next batch: pick one of cycle-4 todo/ remainder (AZ-842 docs / AZ-899 / AZ-900 / AZ-901). OKVIS2 chain (AZ-943 + AZ-951 + AZ-952) sits in todo/ but is sequenced after the Derkachi e2e flight test passes per user 2026-05-29 directive."
detail: "batch 6 of N: AZ-960 gps-denied-render-map CSV-truth dispatch (extends --truth loader to dispatch on extension; removes the AZ-959 _maybe_render_map workaround; unblocks UI map link for CSV uploads). Filed alongside AZ-961 (ReportContext rename, sequenced after AZ-960 to avoid re-conflict on _maybe_render_report kwargs). OKVIS2 chain (AZ-943 + AZ-951 + AZ-952) sits in todo/ but is sequenced after the Derkachi e2e flight test passes per user 2026-05-29 directive."
retry_count: 0
cycle: 4
tracker: jira