[autodev] Step 13 partial: system-level cycle-1 doc sync

Updates _docs/02_document/ to capture the highest-leverage
cycle-1 deltas after 97 implementation batches:

- FINAL_report.md: revise Decision 9 to reflect the actual
  opencv-python pin (>=4.11.0.86,<4.12; D-CROSS-CVE-1
  deferred per leftover); new "Cycle 1 Implementation Status"
  section documents the _STRATEGY_REGISTRY + pre_constructed
  composition-root additions (AZ-591, AZ-618/AZ-619..AZ-624),
  AZ-332 + AZ-333 BLOCKED with parked Tier-2 follow-ups
  AZ-592 + AZ-593, AZ-589 + AZ-590 closed Won't-Fix, Step 11
  Run Tests results (3343 passed / 88 skipped / 0 failed
  local; Docker harness rehab tracked by AZ-602), and the
  deferred-reconciliation list.
- glossary.md: 5 new cycle-1 entries (_STRATEGY_REGISTRY,
  airborne_bootstrap, KltRansac as production-default Tier-1
  VIO, pre_constructed kwarg, Tier-1 task / Tier-2 task
  capability classification). Status line notes the cycle-1
  additions pending re-confirmation.
- ripple_log_cycle1.md (new): explains why per-file
  enumeration is N/A for end-of-cycle-1 sync, lists the
  three doc-update levels and their effective scope, and
  records the recommended follow-up ordering for the
  deferred component / helper / contract / test passes.

Step 13 deferred: architecture.md, module-layout.md,
system-flows.md, 14 component description.md + tests.md,
8 helper docs, 18 contract subfolders, 7 test docs (~50+
files; ~80 product tasks + ~8 helper tasks + ~36 blackbox
test tasks). Filed in FINAL_report.md and
ripple_log_cycle1.md; resume in a fresh conversation per
the 2026-05-18 LESSONS.md guidance.

State: greenfield / Step 13 / in_progress / phase 5
(system-level-updates) / cycle 1.

Co-authored-by: Cursor <cursoragent@cursor.com>
This commit is contained in:
Oleksandr Bezdieniezhnykh
2026-05-19 15:40:14 +03:00
parent eb77f04495
commit 4f122b604d
4 changed files with 112 additions and 9 deletions
+6 -6
View File
@@ -2,13 +2,13 @@
## Current Step
flow: greenfield
step: 12
name: Test-Spec Sync
status: not_started
step: 13
name: Update Docs
status: in_progress
sub_step:
phase: 0
name: awaiting-invocation
detail: "Step 7-11 complete (Step 8/9/10/11 artifacts predate current session); Step 12 must fold AZ-591 + AZ-618 umbrella + AZ-687 ACs into test specs (last touched May 9)"
phase: 5
name: system-level-updates
detail: "FINAL_report.md + glossary.md + ripple_log_cycle1.md done; architecture.md + module-layout.md + 14 components + 8 helpers + tests/ DEFERRED to next session"
retry_count: 0
cycle: 1
tracker: jira