Update autodev state documentation to reflect completion of Plan Step 1, including detailed progress on phases and next steps. Revised phase details to clarify user-level blocking gates and hardware assessment outcomes.
This commit is contained in:
@@ -6,9 +6,9 @@ step: 3
|
||||
name: Plan
|
||||
status: in_progress
|
||||
sub_step:
|
||||
phase: 2
|
||||
name: test-scenarios
|
||||
detail: "Plan Step 1 (test-spec) Phase 1 COMPLETE. User cleared the BLOCKING gate (all 4 questions = A): D1 fix stale docs inline; D2 60-image slice = pipeline-correctness corpus only; D3 spec with placeholder fixtures (satellite tiles + IMU); D4 spec all 46 ACs with data_status markers in traceability-matrix.md. Stale-doc fixes already applied to results_report.md rows 2/19/22/23/25/38 and AC-4.3 v1-scope clause added to acceptance_criteria.md. Findings + locked decisions saved to _docs/02_document/tests/_phase1_findings.md. NEXT on resume: Phase 2 (test-spec/phases/02-test-scenarios.md) — generate 8 artifacts under _docs/02_document/tests/ (environment.md, test-data.md, blackbox-tests.md, performance-tests.md, resilience-tests.md, security-tests.md, resource-limit-tests.md, traceability-matrix.md). Recommended fresh conversation due to context-budget caution zone."
|
||||
phase: 5
|
||||
name: plan-step-1-complete
|
||||
detail: "Plan Step 1 (test-spec sub-skill) COMPLETE. Phase 1 (input-data analysis) DONE earlier; Phase 2 (test scenarios, 8 artifacts) DONE; Phase 3 HARD GATE PASSED (100% spec-level coverage, 0 truly-missing items, 0 removed tests, defer-don't-remove per Phase 1 D4); Hardware Assessment DONE — `## Test Execution` section appended to environment.md classifying project as hardware-dependent and recording the Mode-C (both: Docker for T1/T2/T3 + bench-local for T4 + field for T5) per-tier split decision; Phase 4 (runner-scripts) SKIPPED per skill rule (planning context — script creation deferred to Decompose as tasks). Plan Step 1 user-level BLOCKING gate (test coverage confirmation) was satisfied by the Phase 2 → Phase 3 confirmation earlier in this session. Next: Plan Step 2 (Solution Analysis), opening with BLOCKING Phase 2a.0 (Glossary + Architecture Vision)."
|
||||