Yuzviak
a11ed15187
docs: add Phase 1 ADRs and update PROJECT.md with completed decisions
...
ADR 0002: hexagonal/ports-and-adapters architecture — components/ layout,
protocol.py per component, composition root, core/ for concentrated math.
ADR 0003: @dataclass(slots=True, frozen=True) on hot path; Pydantic retained
only at REST/config/DB boundaries. Pose/GPSPoint migration deferred to Phase 2.
ADR 0004: Stage 2 as independent iteration — own phases 1-6, own requirements,
stage1 code treated as MVP starting capital.
PROJECT.md: Stage 2 Key Decisions updated from Pending → Accepted with Phase 1
implementation notes, deferred work list, and final architecture summary.
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com >
2026-05-11 09:23:09 +03:00
Yuzviak
094895b21b
feat(phases 2-7): implement full GPS-denied navigation pipeline
...
Phase 2 — Visual Odometry:
- ORBVisualOdometry (dev/CI), CuVSLAMVisualOdometry (Jetson)
- TRTInferenceEngine (TensorRT FP16, conditional import)
- create_vo_backend() factory
Phase 3 — Satellite Matching + GPR:
- SatelliteDataManager: local z/x/y tiles, ESKF ±3σ tile selection
- GSD normalization (SAT-03), RANSAC inlier-ratio confidence (SAT-04)
- GlobalPlaceRecognition: Faiss index + numpy fallback
Phase 4 — MAVLink I/O:
- MAVLinkBridge: GPS_INPUT 15+ fields, IMU callback, 1Hz telemetry
- 3-consecutive-failure reloc request
- MockMAVConnection for CI
Phase 5 — Pipeline Wiring:
- ESKF wired into process_frame: VO update → satellite update
- CoordinateTransformer + SatelliteDataManager via DI
- MAVLink state push per frame (PIPE-07)
- Real pixel_to_gps via ray-ground projection (PIPE-06)
- GTSAM ISAM2 update when available (PIPE-03)
Phase 6 — Docker + CI:
- Multi-stage Dockerfile (python:3.11-slim)
- docker-compose.yml (dev), docker-compose.sitl.yml (ArduPilot SITL)
- GitHub Actions: ci.yml (lint+pytest+docker smoke), sitl.yml (nightly)
- tests/test_sitl_integration.py (8 tests, skip without SITL)
Phase 7 — Accuracy Validation:
- AccuracyBenchmark + SyntheticTrajectory
- AC-PERF-1: 80% within 50m ✅
- AC-PERF-2: 60% within 20m ✅
- AC-PERF-3: p95 latency < 400ms ✅
- AC-PERF-4: VO drift 1km < 100m ✅ (actual ~11m)
- scripts/benchmark_accuracy.py CLI
Tests: 195 passed / 8 skipped
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com >
2026-04-02 17:00:41 +03:00
Yuzviak
659050f20b
docs: add requirements and roadmap
...
36 v1 requirements across 6 categories (ESKF, VO, SAT, GPR, MAV, PIPE, TEST).
7-phase roadmap ordered by dependency: ESKF → VO → Satellite → MAVLink → Pipeline → SITL → Validation.
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com >
2026-04-01 20:52:42 +03:00