gen_tests updated solution.md updated
5.0 KiB
ASTRAL-Next Test Specifications Summary
Overview
Comprehensive test specifications for the GPS-denied navigation system following the QA testing pyramid approach.
Total Test Specifications: 54
Test Organization
Integration Tests (01-16): Component Level
Tests individual system components in isolation with their dependencies.
Vision Pipeline (01-04):
- 01: Sequential Visual Odometry (SuperPoint + LightGlue)
- 02: Global Place Recognition (AnyLoc)
- 03: Metric Refinement (LiteSAM)
- 04: Factor Graph Optimizer (GTSAM)
Data Management (05-08):
- 05: Satellite Data Manager
- 06: Coordinate Transformer
- 07: Image Input Pipeline
- 08: Image Rotation Manager
Service Infrastructure (09-12):
- 09: REST API
- 10: SSE Event Streamer
- 11: Flight Manager
- 12: Result Manager
Support Components (13-16):
- 13: Model Manager (TensorRT)
- 14: Failure Recovery Coordinator
- 15: Configuration Manager
- 16: Database Layer
System Integration Tests (21-25): Multi-Component Flows
Tests integration between multiple components.
- 21: End-to-End Normal Flight
- 22: Satellite to Vision Pipeline
- 23: Vision to Optimization Pipeline
- 24: Multi-Component Error Propagation
- 25: Real-Time Streaming Pipeline
Acceptance Tests (31-43): Requirements Validation
Tests mapped to 10 acceptance criteria.
Accuracy (31-32):
- 31: AC-1 - 80% < 50m error
- 32: AC-2 - 60% < 20m error
Robustness (33-35):
- 33: AC-3 - 350m outlier handling
- 34: AC-4 - Sharp turn recovery
- 35: AC-5 - Multi-fragment route connection
User Interaction (36):
- 36: AC-6 - User input after 3 failures
Performance (37-38):
- 37: AC-7 - <5s per image
- 38: AC-8 - Real-time streaming + refinement
Quality Metrics (39-40):
- 39: AC-9 - Registration rate >95%
- 40: AC-10 - MRE <1.0 pixels
Cross-Cutting (41-43):
- 41: Long flight (3000 images)
- 42: Degraded satellite data
- 43: Complete system validation
GPS-Analyzed Scenario Tests (51-54): Real Data
Tests using GPS-analyzed test datasets.
- 51: Test_Baseline (AD000001-030) - Standard flight
- 52: Test_Outlier_350m (AD000045-050) - Outlier scenario
- 53: Test_Sharp_Turn - Multiple sharp turn datasets
- 54: Test_Long_Flight (AD000001-060) - Full dataset
Test Data
GPS Analysis Results
- Mean distance: 120.8m
- Min distance: 24.2m
- Max distance: 268.6m
Identified Sharp Turns (>200m):
- AD000003 → AD000004: 202.2m
- AD000032 → AD000033: 220.6m
- AD000042 → AD000043: 234.2m
- AD000044 → AD000045: 230.2m
- AD000047 → AD000048: 268.6m (largest outlier)
Test Datasets
Test_Baseline: AD000001-030 (30 images, normal spacing) Test_Outlier_350m: AD000045-050 (6 images, 268.6m outlier) Test_Sharp_Turn_A: AD000042, AD000044, AD000045, AD000046 (skip 043) Test_Sharp_Turn_B: AD000032-035 (220m jump) Test_Sharp_Turn_C: AD000003, AD000009 (5-frame gap) Test_Long_Flight: AD000001-060 (all 60 images, all variations)
Acceptance Criteria Coverage
| AC | Requirement | Test Specs | Status |
|---|---|---|---|
| AC-1 | 80% < 50m error | 31, 43, 51, 54 | ✓ Covered |
| AC-2 | 60% < 20m error | 32, 43, 51, 54 | ✓ Covered |
| AC-3 | 350m outlier robust | 33, 43, 52, 54 | ✓ Covered |
| AC-4 | Sharp turn <5% overlap | 34, 43, 53, 54 | ✓ Covered |
| AC-5 | Multi-fragment connection | 35, 43 | ✓ Covered |
| AC-6 | User input after 3 failures | 36, 43 | ✓ Covered |
| AC-7 | <5s per image | 37, 43, 51, 54 | ✓ Covered |
| AC-8 | Real-time + refinement | 38, 43 | ✓ Covered |
| AC-9 | Registration >95% | 39, 43, 51, 54 | ✓ Covered |
| AC-10 | MRE <1.0px | 40, 43 | ✓ Covered |
Test Execution Strategy
Phase 1: Component Integration (01-16)
- Validate each component individually
- Verify interfaces and dependencies
- Establish baseline performance metrics
Phase 2: System Integration (21-25)
- Test multi-component interactions
- Validate end-to-end flows
- Verify error handling across components
Phase 3: Acceptance Testing (31-43)
- Validate all acceptance criteria
- Use GPS-analyzed real data
- Measure against requirements
Phase 4: Special Scenarios (51-54)
- Test specific GPS-identified situations
- Validate outliers and sharp turns
- Full system validation
Success Criteria Summary
Integration Tests: All components pass individual tests, interfaces work correctly System Tests: Multi-component flows work, errors handled properly Acceptance Tests: All 10 ACs met with real data Overall: System meets all requirements, ready for deployment
Test Metrics to Track
- Accuracy: Mean error, RMSE, percentiles
- Performance: Processing time per image, total time
- Reliability: Registration rate, success rate
- Quality: MRE, confidence scores
- Robustness: Outlier handling, error recovery
Notes
- All test specs follow standard format (Integration vs Acceptance)
- GPS-analyzed datasets based on actual test data coordinates
- Specifications ready for QA team implementation
- No code included per requirement
- Tests cover all components and all acceptance criteria