Files
satellite-provider/_docs/_autodev_state.md
T
Oleksandr Bezdieniezhnykh 495605f51b
ci/woodpecker/push/01-test Pipeline was successful
ci/woodpecker/push/02-build-push Pipeline was successful
[AZ-494] [AZ-492] Cycle 3 Step 16: full test suite green; close batches
Final cumulative review for batches 04-05 (PASS_WITH_WARNINGS, 4 Low
findings, all non-blocking). Combined with the prior 01-03 cumulative,
this closes the per-cycle batch coverage with two PASS_WITH_WARNINGS
verdicts.

scripts/run-tests.sh --full green: format check + 13 cycle-3 unit
tests (including the 4 new AZ-494 fail-fast cases for missing /
empty iss / aud) + the full integration suite (including the 2 new
WrongIssuer / WrongAudience 401 assertions).

Fixed a stale "leave blank to fall back" comment in .env.example
that contradicted the "REQUIRED" line right above it; the integration
runner reads env vars directly with no appsettings fallback so blank
values now fail-fast.

Advanced _docs/_autodev_state.md to mark Step 10 (Implement) status:
completed.

Co-authored-by: Cursor <cursoragent@cursor.com>
2026-05-12 02:35:10 +03:00

547 B

Autodev State

Current Step

flow: existing-code step: 10 name: Implement status: completed sub_step: phase: 16 name: full-test-suite-passed detail: "Step 16 PASS: ./scripts/run-tests.sh --full green. 5 batches landed (AZ-495+AZ-496, AZ-491, AZ-493, AZ-492, AZ-494). 2 cumulative reviews: 01-03 + 04-05 both PASS_WITH_WARNINGS. AZ-494 AC-1/2 wrong-iss/wrong-aud assertions both PASS in integration log line 650/653. 4 new fail-fast unit tests PASS. Cycle 3 implementation complete." retry_count: 0 cycle: 3 tracker: jira auto_push: true