mirror of
https://github.com/azaion/ui.git
synced 2026-06-21 08:11:10 +00:00
[AZ-512] Defer to backlog at cross-workspace BLOCKING gate
AZ-512 (Admin edit detection class) hit its spec-defined Cross-Workspace Verification gate during cycle 3 batch 15. The admin/ service (Azaion.AdminApi/Program.cs) exposes /login, /users*, /resources* only — no /classes routes exist, so neither the PATCH this task needs nor the POST/DELETE that AdminPage.tsx already calls today are wired end-to-end. Per the spec's Choose A/B/C (user skipped, defaulted to A): file a prerequisite ticket on admin/ and pause AZ-512 in backlog/. AZ-510 + AZ-511 already shipped this cycle; cycle 3 closes with 6 of 9 points delivered. - Move AZ-512 spec from todo/ to backlog/ with a STATUS banner. - Add Jira comment on AZ-512 documenting the blocker + replay path. - Write leftover record _docs/_process_leftovers/2026-05-13_az-512-... capturing the full prerequisite payload (suggested ticket summary, description, ACs, story points) and the side observation that the existing add+delete affordances on the Detection Classes table are also broken end-to-end against admin/ (pre-existing bug, NOT introduced by cycle 3). - Write batch 15 deferral report. - Write Product Implementation Completeness Gate report (PASS for AZ-510 + AZ-511; AZ-512 deferred is outside the gate's scope). - Write final cycle 3 implementation report with handoff to Step 11. - Advance state: step 10 -> step 11 (Run Tests). Co-authored-by: Cursor <cursoragent@cursor.com>
This commit is contained in:
+8
-17
@@ -2,26 +2,17 @@
|
||||
|
||||
## Current Step
|
||||
flow: existing-code
|
||||
step: 10
|
||||
name: Implement
|
||||
status: in_progress
|
||||
step: 11
|
||||
name: Run Tests
|
||||
status: not_started
|
||||
sub_step:
|
||||
phase: 14
|
||||
name: loop
|
||||
detail: "batch 3 of 3 (AZ-512 next; BLOCKING cross-workspace verification)"
|
||||
phase: 0
|
||||
name: awaiting-invocation
|
||||
detail: ""
|
||||
retry_count: 0
|
||||
cycle: 3
|
||||
tracker: jira
|
||||
|
||||
## Notes
|
||||
- Cycle 3 entered via auto-loop from cycle 2 retrospective.
|
||||
- Cycle 3 epic: **AZ-509** — Auth bootstrap + classColors carve-out + admin class edit.
|
||||
- Cycle 3 tasks (in implementation order — fixes first per user instruction):
|
||||
1. **AZ-510** — Auth bootstrap refresh consolidation (3 pts; closes Finding B3 / Vision P3). Spec: `_docs/02_tasks/todo/AZ-510_auth_bootstrap_consolidation.md`.
|
||||
2. **AZ-511** — classColors carve-out to `src/class-colors/` (3 pts; closes Finding F3 + 5-coupled-places exemption). Spec: `_docs/02_tasks/todo/AZ-511_classcolors_carve_out.md`.
|
||||
3. **AZ-512** — Admin edit existing detection class (3 pts; closes Vision P12 / F10). BLOCKING cross-workspace verification at impl time — `admin/` must expose `PATCH /api/admin/classes/{id}`. Spec: `_docs/02_tasks/todo/AZ-512_admin_edit_detection_class.md`.
|
||||
- Total cycle 3 complexity: 9 points; all PBIs at 3 pts (within 2–5 budget).
|
||||
- Cycle 2 leftovers still pending (carried forward from `_docs/_process_leftovers/2026-05-12_az-498-deploy-and-key-revocations.md`):
|
||||
- L-AZ-498-DEPLOY → scheduled for cycle 3 Step 16 (cross-workspace gate).
|
||||
- L-AZ-499-OWM-REVOKE / L-AZ-501-GOOGLE-REVOKE → await user manual action at OWM / Google Cloud dashboards.
|
||||
- Step 9 (New Task) status: **completed** for cycle 3 — 3 tasks created, epic linked, dependencies table updated. Per existing-code auto-chain rules, Step 9 is a **session boundary**: a new conversation is recommended before Step 10 (Implement).
|
||||
- Cycle 3 Step 10 (Implement) shipped 6 of 9 points: AZ-510 + AZ-511 done; AZ-512 deferred to backlog/ at its BLOCKING cross-workspace verification gate (admin/ workspace lacks the prerequisite /classes routes). Leftover: `_docs/_process_leftovers/2026-05-13_az-512-admin-classes-prereq.md`.
|
||||
- Cycle 2 leftovers still pending (deploy + manual key revocations).
|
||||
|
||||
Reference in New Issue
Block a user