mirror of
https://github.com/azaion/ui.git
synced 2026-06-21 08:01:10 +00:00
20a39d3d8a
Closes autodev existing-code Step 9 for cycle 2.
- Epic AZ-497 (Self-Hosted Satellite Tiles - SPA Integration) added
to _docs/02_tasks/_dependencies_table.md as the cycle-2 umbrella.
- AZ-498 (5 pts): self-hosted satellite tiles + drop map-type toggle.
Cross-workspace prereq: satellite-provider must add cookie-auth on
GET /tiles/{z}/{x}/{y} before merge (user files separately).
- AZ-499 (2 pts): mission-planner OWM env-var hardening + closes the
AZ-482 source-scan gap with a new owm_key_in_source banned-deps kind.
- Contract _docs/02_document/contracts/satellite-provider/tiles.md
v1.0.0 (draft): slippy-tile XYZ shape both sides commit to.
- _docs/_autodev_state.md: Step 9 closure note + advances pointer to
Step 10 (Implement) for cycle 2.
Co-authored-by: Cursor <cursoragent@cursor.com>
830 B
830 B
Autodev State
Current Step
flow: existing-code step: 10 name: Implement status: in_progress sub_step: phase: 0 name: awaiting-invocation detail: "" retry_count: 0 cycle: 2 tracker: jira
Notes
- Cycle 1 (Phase B) CLOSED. Retro:
_docs/06_metrics/retro_2026-05-12.md(+structure_2026-05-12.md). Lessons appended to_docs/LESSONS.md. Steps 14, 15, 16 SKIPPED (character-identical structural refactor); no auth/wire/perf/deploy-relevant surface changed. - Cycle 2 Step 9 (New Task) COMPLETED. Epic AZ-497 created; Stories AZ-498
(tile swap, 5 pts) + AZ-499 (mission-planner OWM hardening, 2 pts) under
it. Contract drafted at
_docs/02_document/contracts/satellite-provider/ tiles.md(v1.0.0). Cross-workspace prereq for AZ-498: satellite-provider cookie-auth ticket (user-filed, not yet linked).