mirror of
https://github.com/azaion/ui.git
synced 2026-06-21 13:41:12 +00:00
23746ec61d
Closes architecture baseline finding F4. Every component now exposes its Public API through `src/<component>/index.ts`; cross-component imports go through the barrel. `scripts/check-arch-imports.mjs` plus `STC-ARCH-01` in the static profile enforce the rule; tests in `tests/architecture_imports.test.ts` cover AC-4/AC-5 + 2 exemption cases. One F3-pending exemption (`classColors`) is documented in 5 places (barrel, consumer, script, doc, test) to avoid a circular import. Phase B cycle 1 batch 1 of 2 (epic AZ-447). Batch 2 is AZ-486 (endpoint builders) — blocked on this commit landing. Co-authored-by: Cursor <cursoragent@cursor.com>
42 lines
2.1 KiB
Markdown
42 lines
2.1 KiB
Markdown
# Autodev State
|
|
|
|
## Current Step
|
|
flow: existing-code
|
|
step: 10
|
|
name: Implement
|
|
status: in_progress
|
|
sub_step:
|
|
phase: 7
|
|
name: batch-9-cycle1-az485-complete
|
|
detail: "AZ-485 (F4 barrels) implemented + reviewed; batch_09_report saved; archive done; AZ-486 is the next batch in cycle 1"
|
|
retry_count: 0
|
|
cycle: 1
|
|
tracker: jira
|
|
step_4_5_glossary_vision: confirmed
|
|
step_2_baseline_routing: per-finding-recommended (option A)
|
|
step_3_results_report_authoring: agent (option A)
|
|
step_3_ac_gap_handling: rollback-to-6c (option A)
|
|
|
|
## Notes
|
|
- Phase A baseline cycle. Step 1 (Document) complete; see
|
|
`_docs/02_document/state.json`, `FINAL_report.md`, `architecture.md`,
|
|
`glossary.md`, plus `_docs/01_solution/solution.md` and
|
|
`_docs/00_problem/{problem,acceptance_criteria,restrictions,security_approach}.md`.
|
|
- Implement-skill batch reports at
|
|
`_docs/03_implementation/batch_0{1..9}_report.md` (batch 09 = AZ-485 cycle-1 batch-1).
|
|
- Cumulative reviews PASS_WITH_WARNINGS at
|
|
`_docs/03_implementation/cumulative_review_batches_01-03_report.md`,
|
|
`_docs/03_implementation/cumulative_review_batches_04-06_cycle1_report.md`,
|
|
`_docs/03_implementation/cumulative_review_batches_07-08_cycle1_report.md`
|
|
(cycle close — Phase A wrap, no batch 9).
|
|
- Phase B started. Step 9 (New Task) cycle 1 closed:
|
|
- AZ-485 (F4 — Public API barrels + STC-ARCH-01, 5 pts, no deps)
|
|
- AZ-486 (F7 — Endpoint builders + STC-ARCH-02, 5 pts, blocked by AZ-485)
|
|
- F1 (mission-planner convergence) deliberately not created — needs `/decompose` for 7+ port-group cycles in its own Epic.
|
|
- Step 10 (Implement) batch 9 (AZ-485) done:
|
|
- 11 new barrels, ~40 production deep imports migrated, ~22 test deep imports migrated.
|
|
- `scripts/check-arch-imports.mjs` + `STC-ARCH-01` static gate added (mirrors the `check-banned-deps.mjs` pattern).
|
|
- `tests/architecture_imports.test.ts` covers AC-4 / AC-5 + 2 exemption cases (4 new fast tests; total 167 PASS / 13 SKIP / 0 FAIL).
|
|
- One F3-pending exemption: `src/features/annotations/classColors` is imported directly (circular-barrel avoidance), documented in 5 places.
|
|
- Next: AZ-486 (endpoint builders) — depends on AZ-485 commits landing first.
|