mirror of
https://github.com/azaion/ui.git
synced 2026-06-21 09:41:11 +00:00
c16c9d8bbb
ci/woodpecker/push/build-arm Pipeline was successful
K=3 cadence cumulative review for the final 2 batches of Phase A. Verdict: PASS_WITH_WARNINGS (0 Critical / 0 High; F-CUM-5 lifts production-drift backlog to 23 entries; F-CUM-4 long-running soak tagging carries over). Phase A is now COMPLETE: 25 test tasks delivered across 8 batches; 0 production source mutations; 26/26 ACs covered in this window; 100% cumulative AC coverage; 29 commit-time static gates active. Next autodev action: Step 7 (Run Tests). Co-authored-by: Cursor <cursoragent@cursor.com>
1.1 KiB
1.1 KiB
Autodev State
Current Step
flow: existing-code step: 6 name: Implement Tests status: in_progress sub_step: phase: 14 name: batch-loop detail: "Phase A closed; 25 tasks delivered; advance to Step 7" retry_count: 0 cycle: 1 tracker: jira step_4_5_glossary_vision: confirmed step_2_baseline_routing: per-finding-recommended (option A) step_3_results_report_authoring: agent (option A) step_3_ac_gap_handling: rollback-to-6c (option A)
Notes
- Phase A baseline cycle. Step 1 (Document) complete; see
_docs/02_document/state.json,FINAL_report.md,architecture.md,glossary.md, plus_docs/01_solution/solution.mdand_docs/00_problem/{problem,acceptance_criteria,restrictions,security_approach}.md. - Implement-skill batch reports at
_docs/03_implementation/batch_0{1..8}_report.md. - Cumulative reviews PASS_WITH_WARNINGS at
_docs/03_implementation/cumulative_review_batches_01-03_report.md,_docs/03_implementation/cumulative_review_batches_04-06_cycle1_report.md,_docs/03_implementation/cumulative_review_batches_07-08_cycle1_report.md(cycle close — Phase A wrap, no batch 9).