Files
ui/_docs/_autodev_state.md
T
Oleksandr Bezdieniezhnykh ef56d9c207 [AZ-512] chore: reactivate for cycle 4 (Option B path)
User authorized Option B from the original AZ-512 Cross-Workspace
Verification gate: implement UI form with MSW-stubbed tests in
parallel with AZ-513 shipping on admin/. Task spec moved from
backlog/ → todo/. STATUS line updated. Leftover record re-opened
until AZ-513 deploys live.

Co-authored-by: Cursor <cursoragent@cursor.com>
2026-05-13 04:21:32 +03:00

828 B

Autodev State

Current Step

flow: existing-code step: 10 name: Implement status: in_progress sub_step: phase: 0 name: awaiting-invocation detail: "" retry_count: 0 cycle: 4 tracker: jira

Notes

  • Cycle 3 closed 2026-05-13 (commit eef3bdf): 6/9 pts shipped, AZ-512 → backlog (AZ-513 prereq on admin/).
  • Cycle 4 entry: user reactivated AZ-512 (Option B path, MSW-stubbed). Step 9 (New Task) skipped — task spec already exists in _docs/02_tasks/todo/AZ-512_admin_edit_detection_class.md.
  • Cross-workspace dependency: AZ-513 on admin/ NOT shipped at cycle entry. Step 11 (Run Tests) will pass on MSW stubs; Step 16 (Deploy) gates on AZ-513 landing live.
  • Leftovers: 2026-05-12_az-498-deploy-and-key-revocations.md (manual), 2026-05-13_az-512-admin-classes-prereq.md (re-opened until AZ-513 deploys live).