mirror of
https://github.com/azaion/ui.git
synced 2026-06-21 12:21:10 +00:00
f2451944fd
- AZ-474 tile-split + YOLO parser + auto-zoom + indicator + malformed (FT-P-51..55, FT-N-10): 13 fast (6 it.fails for AC-1..6 + 7 controls) + 2 e2e (test.fail for FT-P-51 + FT-P-53). The split surface is QUARANTINED today (D11) — no Split-tile button, no parser, no <TileViewer>; all 6 ACs are documented drift, every it.fails paired with a control PASS pinning current behaviour. - AZ-480 prod image + nginx routing + RAM (NFT-RES-LIM-02 /03/08/09/10): 4 new static checks promoted into the per-commit profile (STC-RES02 500M cap, STC-RES03 Dockerfile final-stage nginx:alpine no Node, STC-RES09 exactly 9 /api/* location blocks, STC-RES10 prefix-strip on every route). 3 e2e (docker-no-Node probe, runtime prefix-strip, long-running RAM soak — all gated on docker availability + image build; RAM soak also on RUN_LONG_RUNNING=1). Phase A — One-time baseline setup is now COMPLETE. The todo/ directory is empty after this batch's archival. Cumulative review for batches 07-08 is the next autodev action; after that, Step 7 (Run Tests) auto-chains. Code review: PASS (0 findings). Fast: 26/26 files, 163 passed / 13 skipped. Static: 29/29 PASS (incl. 4 new STC-RES* gates). Co-authored-by: Cursor <cursoragent@cursor.com>
1.0 KiB
1.0 KiB
Autodev State
Current Step
flow: existing-code step: 6 name: Implement Tests status: in_progress sub_step: phase: 14 name: batch-loop detail: "batch 8 closed; cumulative 07-08 due" retry_count: 0 cycle: 1 tracker: jira step_4_5_glossary_vision: confirmed step_2_baseline_routing: per-finding-recommended (option A) step_3_results_report_authoring: agent (option A) step_3_ac_gap_handling: rollback-to-6c (option A)
Notes
- Phase A baseline cycle. Step 1 (Document) complete; see
_docs/02_document/state.json,FINAL_report.md,architecture.md,glossary.md, plus_docs/01_solution/solution.mdand_docs/00_problem/{problem,acceptance_criteria,restrictions,security_approach}.md. - Implement-skill batch reports at
_docs/03_implementation/batch_0{1,2,3,4,5,6}_report.md. - Cumulative reviews PASS_WITH_WARNINGS at
_docs/03_implementation/cumulative_review_batches_01-03_report.mdand_docs/03_implementation/cumulative_review_batches_04-06_cycle1_report.md. Next cumulative review due after batch 9 (covers batches 07-09).