Files
gps-denied-onboard/_docs/_autodev_state.md
T
Oleksandr Bezdieniezhnykh 2cc992da4a [AZ-842] Record wider Jira drift audit + correct fictional batch narrative
Follow-up to commit 10c2a1e (AZ-842 tracker-only fix). That commit's
preamble narrative ("cycle-4 todo/ remainder: AZ-899 + AZ-900 + AZ-901
= 3 SP") was wrong — those three specs have been in done/ the entire
time. Investigating that fiction surfaced wider drift:

- 10 cycle-3/4 tickets shipped to done/ locally but stuck in
  "In Testing" in Jira (AZ-836/838/839/840/894/895/896/899/900/901).
- Epic AZ-835 stuck in "To Do" with all 5 children Done or deferred.

Surfaced to user as A/B/C/D convention question (Done = shipped+tested
vs Done = QA-accepted). User skipped — interpreted as "use judgment,
don't block". Per scope-discipline rule, NOT bulk-modifying tracker
state outside the current task scope.

Changes:
- _docs/_process_leftovers/2026-05-29_jira_status_drift_audit.md:
  full audit + replay-ready bulk-transition payload for whichever
  convention the user picks.
- dep-table preamble: tenth bump corrects the fictional remainder
  narrative; records the leftover; states the actual fact (no product
  work left in cycle-4 todo/; OKVIS2 chain deferred).
- state.md: batch 8 detail updated with the corrected story.

No code changes.

Co-authored-by: Cursor <cursoragent@cursor.com>
2026-05-29 13:18:54 +03:00

15 lines
1.1 KiB
Markdown

# Autodev State
## Current Step
flow: existing-code
step: 10
name: Implement
status: in_progress
sub_step:
phase: 6
name: implement-tasks
detail: "batch 8 = tracker-only fix for AZ-842 (To Do → Done, read-back verified) + wider Jira drift audit recorded as `_docs/_process_leftovers/2026-05-29_jira_status_drift_audit.md`. 10 cycle-3/4 tickets (AZ-836/838/839/840/894/895/896/899/900/901) shipped to `done/` locally but stuck in 'In Testing' in Jira; Epic AZ-835 in `todo/` with all 5 children done. User skipped A/B/C/D convention question — leftover holds the bulk-transition payload for whichever convention they pick. **Corrected cycle-4 todo/ remainder**: nothing actionable. Earlier narratives that listed AZ-899/900/901 as 'cycle-4 todo/ remainder for next batches' were fiction — those specs have been in done/ the whole time. OKVIS2 chain (AZ-943/951/952) sits in todo/ but is deferred per user 2026-05-29 directive until after Derkachi e2e flight test passes. Cycle-4 product work is effectively complete pending Derkachi e2e green + AZ-897 UI in ../ui."
retry_count: 0
cycle: 4
tracker: jira