Local Tier-1 pytest suite: 3343 pass / 88 skip / 0 fail across 12 chunks. Docker harness SUT Reality Gate UNMET — both Tier-1 docker harnesses (scripts/run-tests.sh and e2e/docker/run-tier1.sh) have pre-existing drift that prevents them from running end-to-end. Findings: H-1..H-3 (fixed in6ce3158): dockerfile rename, fdr-output tmpfs cap, e2e-results bind dir + gitignore. H-4..H-6 (deferred): three SITL/MAVLink Docker Hub images don't exist (ardupilot/mavproxy, ardupilot/ardupilot-sitl, inavflight/inav-sitl). environment.md spec was written against aspirational image names. H-7..H-8 (deferred): tests/e2e/Dockerfile entrypoint points at empty scenarios dir + doesn't install the SUT package. H-9 (deferred): tile-cache-fixture seeder missing (relates to AZ-595). Plus a regression caught and fixed mid-run: pytest-csv autoload conflicts with our custom --csv flag (commiteb6dc17). Also surfaced a false-positive batch-89 test-result report; proposed preventive meta-rule pending user approval. Step 11 marked status=blocked pending harness rehabilitation tickets (payloads recorded in _docs/_process_leftovers/). Full outcome report: _docs/03_implementation/run_tests_step11_report.md. Co-authored-by: Cursor <cursoragent@cursor.com>
24 lines
1.1 KiB
Markdown
24 lines
1.1 KiB
Markdown
# Autodev State
|
|
|
|
## Current Step
|
|
flow: greenfield
|
|
step: 11
|
|
name: Run Tests
|
|
status: blocked
|
|
sub_step:
|
|
phase: 4
|
|
name: sut-reality-gate-deferred
|
|
detail: ""
|
|
retry_count: 0
|
|
cycle: 1
|
|
tracker: jira
|
|
last_completed_batch: 89
|
|
last_cumulative_review: batches_85-87
|
|
current_batch: 89
|
|
|
|
last_step_outcomes:
|
|
step_8: "Code is testable — no changes needed (testability_assessment.md committed; no list-of-changes, no source edits)"
|
|
step_9: "41 blackbox test tasks (AZ-406..AZ-446) under epic AZ-262 in _docs/02_tasks/todo/ pre-existing; AZ-406 test-infra bootstrap pre-existing. Folder fallback satisfied. No Step-9 work executed in cycle 1."
|
|
step_10: "41 of 41 blackbox-test tasks done (AZ-406..AZ-446). Final report at _docs/03_implementation/implementation_report_tests.md. Full-suite gate handed off to test-run skill per implement Step 16."
|
|
step_11: "Local Tier-1 pytest: 3343 pass / 88 skip / 0 fail (after csv_reporter fix in eb6dc17). SUT Reality Gate UNMET — both docker harnesses blocked by pre-existing drift (3 SITL images missing + 5 other bugs). Full report: _docs/03_implementation/run_tests_step11_report.md. Tickets deferred to leftovers."
|