Files
ui/_docs/_autodev_state.md
T
Oleksandr Bezdieniezhnykh 2071a24391
ci/woodpecker/push/build-arm Pipeline was successful
[AZ-485] [AZ-486] Phase B Step 9: F4 barrels + F7 endpoints task specs
Closes Step 9 New Task cycle 1. Two refactor tasks created under epic
AZ-447 to address architecture compliance baseline findings:

- AZ-485 (5 pts) — F4 Public API barrels per component + STC-ARCH-01
- AZ-486 (5 pts) — F7 endpoint builders (endpoints.ts) + STC-ARCH-02
  (depends on AZ-485; Jira "Blocks" link set)

F1 (mission-planner duplication) deliberately deferred. Baseline routes
it through 7+ Phase B port-group cycles requiring decompose pass into
its own Epic; out of scope for new-task.

_autodev_state.md advances to Step 10 (Implement), awaiting invocation
for AZ-485 first.

Co-authored-by: Cursor <cursoragent@cursor.com>
2026-05-11 10:14:12 +03:00

1.7 KiB

Autodev State

Current Step

flow: existing-code step: 10 name: Implement status: not_started sub_step: phase: 0 name: awaiting-invocation detail: "Step 9 closed; AZ-485 (F4 barrels) + AZ-486 (F7 endpoints) ready in todo/; AZ-485 first (AZ-486 depends on barrel)" retry_count: 0 cycle: 1 tracker: jira step_4_5_glossary_vision: confirmed step_2_baseline_routing: per-finding-recommended (option A) step_3_results_report_authoring: agent (option A) step_3_ac_gap_handling: rollback-to-6c (option A)

Notes

  • Phase A baseline cycle. Step 1 (Document) complete; see _docs/02_document/state.json, FINAL_report.md, architecture.md, glossary.md, plus _docs/01_solution/solution.md and _docs/00_problem/{problem,acceptance_criteria,restrictions,security_approach}.md.
  • Implement-skill batch reports at _docs/03_implementation/batch_0{1..8}_report.md.
  • Cumulative reviews PASS_WITH_WARNINGS at _docs/03_implementation/cumulative_review_batches_01-03_report.md, _docs/03_implementation/cumulative_review_batches_04-06_cycle1_report.md, _docs/03_implementation/cumulative_review_batches_07-08_cycle1_report.md (cycle close — Phase A wrap, no batch 9).
  • Phase B started. Step 9 (New Task) cycle 1 closed:
    • AZ-485 (F4 — Public API barrels + STC-ARCH-01, 5 pts, no deps)
    • AZ-486 (F7 — Endpoint builders + STC-ARCH-02, 5 pts, blocked by AZ-485)
    • F1 (mission-planner convergence) deliberately not created — needs /decompose for 7+ port-group cycles in its own Epic.
  • Step 10 (Implement) starts with AZ-485 — Blackbox Tests owns the static-check addition and the tests/** import-path migration; production component teams own their barrel files per module-layout.md.